Effect of Change in Setup Times Levels on Mean Flow Time and Mean Tardiness in a Stochastic Dynamic Job Shop Manufacturing System
نویسنده
چکیده
The job shop scheduling problem is a combinatorial optimization problem and one of the most complex problems among various production scheduling problems. The present work assesses the effect of change in setup time’s levels on mean flow time and means tardiness measures. The simulation model of the job shop is developed for investigation purpose. Three levels of setup times i.e. SUL_1, SUL_2 and SUL_3 are considered in order to assess the effect of change in setup times levels on system performance. Simulation results indicate that the change in setup time’s levels has a significant effect on system performance.
منابع مشابه
Change in Setup Times Levels in a Stochastic Dynamic Job Shop Manufacturing System
Job shop scheduling problems occurs in automobile industry, aerospace industry, printing industry, and chemical industry. Job shop scheduling problems are real world and complex. The present work assesses the effect of change in setup times levels on make span, maximum flow time and maximum tardiness measures. The model of the job shop is developed in PROMODEL simulation software. Three levels ...
متن کاملPerformance analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times: Simulation approach
Stochastic dynamic job shop scheduling problem with consideration of sequence-dependent setup times are among the most difficult classes of scheduling problems. This paper assesses the performance of nine dispatching rules in such shop from makespan, mean flow time, maximum flow time, mean tardiness, maximum tardiness, number of tardy jobs, total setups and mean setup time performance measures ...
متن کاملA fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times
This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...
متن کاملMinimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...
متن کاملImpact of System Utilization on Setup Oriented Performance Measures in a Stochastic Dynamic Job Shop Manufacturing System
The various industries such as automobile industry, aerospace industry, printing industry, and chemical industry operate on job shop system. Job shop scheduling problems are complex and real world. The present work assesses the effect of change in shop utilizations levels on total setups and mean setup time measures. The simulation model of the job shop is developed for investigation purpose. T...
متن کامل