Methodology for the Building of a Fuzzy Expert System for Predictive Maintenance of Hydroelectric Power Plants

نویسندگان

  • Iván Patricio Moreno
  • Alberto José Álvares
چکیده

The aim of this study is giving continuity to the evolution of the SIMPREBAL methodology and computer system based on the specification OSA-CBM (Open System Architecture for Condition Based Maintenance). The operation of the SIMPREBAL (Predictive Maintenance System of Balbina) system mainly is based on the collection and analysis of the monitored physics variables in hydroelectric power plants, those variables are obtained from intelligent sensors to be usually installed on the generator units of hydroelectric power plants and on the implementation of a computer system based on diagnosis of the running states of the devices with the objective to help the establishment of decision making and maintenance operational actions of the machines thus, increasing their availability. It will therefore develop a new intelligent system to improve the performance of the SIMPREBAL system. This approach involves the development of a production rules based fuzzy expert system; this model and reasoning mechanisms are implemented using Java, JESS (Java Expert System Shell) and the NRC FuzzyJ Toolkit for the Java Platform Version 1.8. Basically the development of the methodology will be divided in 3 main parts; In summary, first the dates to be obtained from sensors, will be fuzzificated with their fuzzy sets, then those fuzzificated inputs will be matched against the production rules of the system applying the main fuzzy inference techniques such as MandaniStyle, Sugeno-Style, etc. to evaluate the performance of the system and finally the outputs of the system will be defuzzificated applying some appropriates methods of defuzzification (Decoding) such as the Center of Gravity (COG) technique, the Center of Area (COA) technique, etc. and then apply those defuzzificated outputs to the new system with the final objective of establishing one or several maintenance procedures so that the process operator can make the best decisions. Finally, to be able to establish final conclusions, it will analyze a case study to validate the performance of the new system in the hydroelectric power plant of Balbina to be approximately to 220 km of the Manaus city.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Overview of Hydroelectric Power Plant: Operation, Modeling, and Control

Renewable energy provides twenty percent of electricity generation worldwide. Hydroelectric power is the cheapest way to generate electricity today. It is a renewable source of energy and provides almost one-fifth of electricity in the world. Also, it generates electricity using a renewable natural resource and accounting for six percent of worldwide energy supply or about fifteen percent of th...

متن کامل

A Dynamic Fuzzy Expert System Based on Maintenance Indicators for Service Type Selection of Machinery

Due to the multiplicity of standards and complex rules; maintenance, repair and servicing of machinery could be done only by the fully qualified and proficient experts. Since the knowledge of such experts is not available all times, using expert systems can help to improve the maintenance process. To address this need and the uncertainty of the maintenance process indicators, this research prop...

متن کامل

Estimating Efficiency of Thermal and Hydroelectric Power Plants in Iranian Provinces

This paper aims at estimating the efficiency of hydroelectric power plants (renewable energy resources) and thermal power plant (non-renewable energy resources) in Iranian provinces. Data Envelopment Analysis (DEA) approaches is applied to estimate the efficiency. The network is modeled as a linear system with multiple inputs and one output. Fuel cost, labor force, operation cost are used as in...

متن کامل

Environmental Planning for Wind Power Plant Site Selection using a Fuzzy PROMETHEE-Based Outranking Method in Geographical Information System

Selection of suitable sites for wind power plants is one of the most important decision on wind resources development. Site selection for the establishment of large wind power plants requires spatial evaluation taking technical, economic, and environmental considerations into account. This study has applied a combination of PROMETHEE and Fuzzy AHP methods in a geographical information system en...

متن کامل

Reliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants

  Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011