Risks in ERP Project – Case Study of IS/ICT Management Capability Maturity Level and Risk Assessment

نویسندگان

  • Mika Ojala
  • Inka Vilpola
  • Ilkka Kouri
چکیده

Enterprise resource planning (ERP) projects are considered to be expensive, time-consuming, difficult to manage, and extremely risky. ERP projects are risky from the strategic, operational, technical and organisational perspectives. The risks and critical success factors of ERP projects have been widely studied, and the management of risks is crucial to a successful ERP project. Generic risk analyses have faced inflation, and in the worst case companies do not manage risks in their ERP projects at all. This paper presents the early stage assessment of ERP project risks in three firms’ ERP projects. The focus is on company-specific risk identification. Companies of this study have limited maturity in IS/ICT management capabilities. Understanding of capability maturity level is useful to efficient risk management in an ERP project. In this paper we compare the company-specific risks to common risk list found in the literature. Qualitative case study of three firms provides empirical evidence of uncovered ERP risks if only common risk list is used. As a result we claim that in addition to generic project management risks there is also a need to assess company-specific-risks. In fact, company-specific risks are usually critical to company’s ERP project success.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses

The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...

متن کامل

Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method

Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...

متن کامل

The role of Real option in e-business Risk management: The case of E-treasury project

Implementing information technology projects requires a calculated process to prevent failure. At the same time application of information technology in organizations faces various potential risks. Exploring information technology environment in organizations reveals the potential risks and provides a structure for comprehensive risk management. There are various methods available for risk mana...

متن کامل

Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interv...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006