Re-Planning for a Successful Project Schedule

نویسندگان

  • Austen Rainer
  • Martin J. Shepperd
چکیده

Time to market or project duration has increasing significance for commercial software development. We report on a longitudinal study of a project at a leading international software organisation. The focus of this study was schedule behaviour, however, we explored a range of factors including planned versus actual progress, resource allocation and functionality delivered. In the course of the twelve-month study, evidence was collected from 8 interviews, 49 project meetings, a number of other project documents and a feedback workshop. The project leader considered the project to be a success not only in terms of satisfying resource and schedule objectives but also in the marketplace. While many of the originally planned external commitments were met, it is clear that the project did not adhere to its original (detailed) plan and indeed there were no less than seven replans. These re-plans were mainly in response to inaccuracies in the original plan, rather than in response to the introduction of additional requirements (of which there were several) or problems with external dependencies. Furthermore, these re-plans suggest a distinction between the nature of the initial planning process and the nature of the re-planning process during the project. Attention is also directed at the implications these re-plans have for metrics and estimation research.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Extension of the Earned Value Management to Improve the Accuracy of Schedule Analysis Results

A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [CE1] Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past ca...

متن کامل

A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities

Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

متن کامل

Development of a Generic Risk Matrix to Manage Project Risks

A generic risk matrix is presented for use identifying and assessing project risks quickly and cost effectively. It assists project managers with few resources to perform project risk analysis. The generic risk matrix (GRM) contains a broad set of risks that are categorized and ranked according to their potential impact and probability of occurrence. The matrix assists PMs in quickly identifyin...

متن کامل

A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION

<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...

متن کامل

A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION

<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999