Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups

نویسندگان

  • António Aroso Menezes
  • Alistair R. Clark
  • Bernardo Almada-Lobo
چکیده

In production planning, sequence dependent setup times and costs are often incurred for switchovers from one product to another. When setup times and costs do not respect the triangular inequality, a situation may occur where the optimal solution includes more than one batch of the same product in a single period — in other words, at least one sub tour exists in the production sequence of that period. By allowing setup crossovers, flexibility is increased and better solutions can be found. In tight capacity conditions, or whenever setup times are significant, setup crossovers are needed to assure feasibility. We present the first linear mixed integer programming extension for the capacitated lotsizing and scheduling problem incorporating all the necessary features of sequence sub tours and setup crossovers. This formulation is more efficient than other well known lotsizing and scheduling models.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups

  The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic me...

متن کامل

Lot Sizing and Scheduling in Flow Shop with Sequence-Dependent Setups and Backlogging

Lot sizing and scheduling in flow shop has been considered in this paper. Our study includes a multi-level and multi-period capacitated lot sizing and scheduling problem (CLSP) with sequence-dependent setups, setups carry over in flow shop. In manufacturing environments backlogging is unavoidable. If the production capacity is infinite, any demand can be satisfied

متن کامل

Relax and Fix Heuristics for Simultaneous Lot Sizing and Sequencing the Permutation Flow Shops with Sequence-Dependent Setups

  This paper proposes two relax and fix heuristics for the simultaneous lot sizing and sequencing problem in permutation flow shops involving sequence-dependent setups and capacity constraints. To evaluate the effectiveness of mentioned heuristics, two lower bounds are developed and compared against the optimal solution. The results of heuristics are compared with the selected lower bound .

متن کامل

An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups

This paper presents a novel mathematical programming approach to the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and setup costs. The approach is partly based on the earlier work of Haase and Kimms [2000. Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. International Journal of ...

متن کامل

LTO Heuristics for Capacitated Lot Sizing Problem with Sequence Dependent Setups and Overtimes

The wellknown CLSP problem is generalized including sequence dependent setup times and overtimes and modeling it as a quadratic mixed 0-1 integer programming problem called Capacitated Lot Sizing Problem with Sequence Dependent Setups and Overtimes. We develop a heuristics based on Lagrangean relaxation and tabu search for solving the problem. At the end, some computational results are presented.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • J. Scheduling

دوره 14  شماره 

صفحات  -

تاریخ انتشار 2011