Meeting Correlated Spare Part Demands with Optimal Transshipments
نویسندگان
چکیده
This paper studies spare part transshipments between two service part facilities whose demands are correlated. Transshipments are used to reduce severity of part stock outs. Facilities are run by an inventory manager (IM) who minimizes replenishment, transshipment, and inventory costs. We show that the optimal transshipment policy is an inventory hold-back type; if the part inventory at a facility is less than or equal to its hold-back level, a transshipment request made for that part by a stocked out retailer is rejected. The hold-back levels increase toward the next replenishment of partsThis implies that transshipment requests are initially accepted until a critical time and afterwards they are rejected. A heuristic is designed using this critical time as the single decision variable. It performs within 0.7-1.8% of the optimal cost. Heuristic policies of no inventory sharing and complete sharing, respectively, perform within 3% and 2% of the optimal cost. Since the computation of hold-back levels and implementation of the optimal transshipments, respectively, require limited resources and little IM oversight, we advocate for the use of the optimal transshipment policy.
منابع مشابه
Optimal lateral transshipment policy for a two location inventory problem
We consider an inventory model for spare parts with two stockpoints, providing repairable parts for a critical component of advanced technical systems. As downtime costs for these systems are huge, ready-for-use spare parts are kept on stock, to be able to quickly respond to a breakdown of a system. We allow for lateral transshipments of parts between the stockpoints upon a demand arrival for a...
متن کاملState dependent spare part management policy for airport maintenance
In this study we use a flexible policy of spare part management in the context of airports corrective maintenance activities and provide a new approach for mathematically evaluate the performances of systems with lateral transshipments in case of one-for-one ordering policies, transfer times and peaked demand. This study deals with the spare optimization of a large logistics company, in charge ...
متن کاملMulti-item spare parts systems with lateral transshipments and waiting time constraints
This paper deals with the analysis of a multi-item, continuous review model of two-location inventory systems for repairable spare parts in which lateral and emergency shipments occur in response to stockouts. A continuous review basestock policy is assumed for the inventory control of the spare parts. The objective is to minimize the total costs for inventory holding, lateral transshipments an...
متن کاملCapacitated Production Control with Virtual Lateral Transshipments
We study the optimal control of a firm with two capacitated manufacturing plants situated in two distinct geographical regions. Demands from each region are mostly satisfied by the local plant. However, if necessary, some of the newly arrived demands can be designated to be served by the other, more remote, plant. The sources of the above virtual lateral transshipments, unlike the ones involved...
متن کاملService differentiation through selective lateral transshipments
We consider a multi-item spare parts optimization problem with multiple warehouses and two customer classes, where lateral transshipments are used as a differentiation tool. Specifically, premium requests that cannot be met from stock at their preferred warehouse may be satisfied from stock at other warehouses (so-called lateral transshipments). We first derive approximations for the mean waiti...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IJSDS
دوره 1 شماره
صفحات -
تاریخ انتشار 2010