Disruption management in flight gate scheduling

نویسندگان

  • Ulrich Dorndorf
  • Florian Jaehn
  • Hui Ma
  • Siping Lu
  • Erwin Pesch
چکیده

Due to the rapid growth of air transport traffic, how to efficiently allocate gates at airports to incoming or outgoing flights has become one of the most important problems which managers of airlines and airports have to concern about. The problem, which can be modeled as a scheduling problem, is often referred to as flight gate scheduling. The main purpose of flight gate scheduling is to find an assignment of flights, i.e. the aircraft serving a flight, to aircraft stands, as well as start and completion times for processing an aircraft at the position it has been assigned to. Flight-togate assignments not only affect an airport’s operating efficiency but also its level

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Benders’ decomposition algorithm to solve bi-level bi-objective scheduling of aircrafts and gate assignment under uncertainty

Management and scheduling of flights and assignment of gates to aircraft play a significant role to improve the performance of the airport, due to the growing number of flights and decreasing the flight times. This research addresses the assignement and scheduling problem of runways and gates simultaneously. Moreover, this research is the first study that considers the constraint of unavailabil...

متن کامل

Analysis of Gate-Hold Delays At the OEP-35 Airports

One point of congestion in the air transportation system is the set of gates at a terminal. When an inbound flight is unable to pull into its assigned gate, the flight, its connecting passengers, and its flight crews experience delays and missed connections. Previous research has focussed on optimizing gate assignments, both scheduled and disrupted, and optimizing surface flow. This paper analy...

متن کامل

A Bi-Objective Airport Gate Scheduling with Controllable Processing Times Using Harmony Search and NSGA-II Algorithms

Optimizing gate scheduling at airports is an old, but also a broad problem. The main purpose of this problem is to find an assignment for the flights arriving at and departing from an airport, while satisfying a set of constraints.A closer look at the literature in this research line shows thatin almost all studies airport gate processing time has been considered as a fix parameter. In this res...

متن کامل

Gain Scheduling Waste-gate Control of Turbocharger Using MATLAB & GT-POWER

Turbochargers are used to increase engine manifold air pressure. Control of intake manifold pressure is crucial issue which is done through the speed control of turbocharger, but since it is difficult to directly control the speed of the turbocharger, it is done indirectly through a gate that called the waste gate, which is located in the engine outlet and turbocharger’s turbine inlet. One of t...

متن کامل

Flight Gate Allocation: Modells, Methods and Robust Solutions

We consider the problem of assigning flights to airport gates. We examine the general case in which an aircraft serving a flight may be assigned to different gates for arrival and departure processing and for optional intermediate parking. Restrictions to this assignment include gate closures and shadow restrictions, i. e. the situation where certain gate assignments may cause blocking of neigh...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007