Robust Airline Scheduling Under Block-Time Uncertainty

نویسندگان

  • Milind G. Sohoni
  • Yu-Ching Lee
  • Diego Klabjan
چکیده

Airline schedule development continues to remain one of the most challenging planning activity for any airline. An airline schedule comprises of a list of flights and specifies the origin, destination, scheduled departure, and arrival time of each flight in the airline’s network. A critical component of the schedule development activity is the choice of flight block-times, which depend on several factors. Many airlines decide schedule block-times based on fixed percentiles of block-time distributions built from historical data, however, such techniques have not resulted in significantly improved on-time performance of the schedule during operations. Thus, from a passenger’s perspective, the service level guarantee of an airline’s network continues to be low. We first define two service level metrics for an airline schedule. The first one is similar to the on-time performance measure of the U.S. Department of Transportation and we define it as the flight service level. The second metric, called the network service level, is geared towards completion of passenger itineraries. We then develop a stochastic integer programming formulation that optimally perturbs a given schedule to maximize expected profit while ensuring the two service levels. We also develop a variant of this model that maximizes service levels while achieving desired network profitability. To solve these models we develop an efficient algorithm that guarantees optimality. Through extensive computational experiments, using real-world data, we demonstrate that our models and algorithms are efficient and achieve the desired trade-off between service level and profitability.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

Development of a Model for Locating Hubs in a Competitive Environment under Uncertainty: A Robust Optimization Approach

This article explores the development of previous models to determine hubs in a competitive environment. In this paper, by comparing parameters of the ticket price, travel time and the service quality of hub airports, airline hubs are divided into six categories. The degree of importance of travel time and travel cost are determined by a multivariate Lagrange interpolation method, which can pla...

متن کامل

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

Scheduling Post-Distribution Cross-Dock under Demand Uncertainty

The system of distribution of goods and services, along with other economic developments around the world, is rapidly evolving. In the world of distribution of goods, the main focus is on making distribution operations more effective. Due to the fact that the cross-dock has the advantage of removing intermediaries and reducing the space required for the warehouse, it is worth considering. Among...

متن کامل

Bi-criteria Three Stage Fuzzy Flowshop Scheduling with Transportation Time and Job Block Criteria

Scheduling is an enduring process where the existence of real time information frequently forces the review and modification of pre-established schedules. The real world is complex and complexity generally arises from uncertainty. From this prospective the concept of fuzziness is introduced in the field of scheduling. The present paper pertains to a bi-criterion in n-jobs, three machines fl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Transportation Science

دوره 45  شماره 

صفحات  -

تاریخ انتشار 2011