Multiprocessor scheduling implementation of the simultaneous multiple volume (SMV) navigator method.
نویسندگان
چکیده
The simultaneous multiple volume (SMV) approach in navigator-gated MRI allows the use of the whole motion range or the entire scan time for the reconstruction of final images by simultaneously acquiring different image volumes at different motion states. The motion tolerance range for each volume is kept small, thus SMV substantially increases the scan efficiency of navigator methods while maintaining the effectiveness of motion suppression. This article reports a general implementation of the SMV approach using a multiprocessor scheduling algorithm. Each motion state is regarded as a processor and each volume is regarded as a job. An efficient scheduling that completes all jobs in minimal time is maintained even when the motion pattern changes. Initial experiments demonstrated that SMV significantly increased the scan efficiency of navigator-gated MRI.
منابع مشابه
Simultaneous multiple volume (SMV) acquisition algorithm for real-time navigator gating.
Navigator gating techniques can effectively reduce motion effects in MRI by accepting data only when the object is in a small range of positions at the cost of significantly prolonging scan time. A simultaneous multiple volume (SMV) algorithm is reported here that can substantially increase the scan efficiency while maintaining the effectiveness of motion suppression. This is achieved by acquir...
متن کاملA MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES
In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...
متن کاملSimultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts
Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem...
متن کاملA Multiprocessor System with Non-Preemptive Earliest-Deadline-First Scheduling Policy: A Performability Study
This paper introduces an analytical method for approximating the performability of a firm realtime system modeled by a multi-server queue. The service discipline in the queue is earliestdeadline- first (EDF), which is an optimal scheduling algorithm. Real-time jobs with exponentially distributed relative deadlines arrive according to a Poisson process. All jobs have deadlines until the end of s...
متن کاملPre-scheduling and Scheduling of Task Graph on Homogeneous Multiprocessor Systems
Task graph scheduling is a multi-objective optimization and NP-hard problem. In this paper a new algorithm on homogeneous multiprocessors systems is proposed. Basically, scheduling algorithms are targeted to balance the two parameters of time and energy consumption. These two parameters are up to a certain limit in contrast with each other and improvement of one causes reduction in the othe...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Magnetic resonance in medicine
دوره 52 2 شماره
صفحات -
تاریخ انتشار 2004