Sustainable Construction: An Information Modelling Approach for Waste Reduction

نویسنده

  • K. Hewage
چکیده

Construction waste is considered as a major contributor of solid wastes in municipal landfills. Construction, renovation, and demolition (CRD) waste generated by the Canadian construction industry accounts for 27% of total municipal solid waste disposed in landfills. However, many researchers stated that 75% of what the construction industry generates as waste has a residual value and therefore recycled, salvaged, and/or reused. With the same philosophy, municipal landfill facility of the city of Vancouver and Kelowna, Canada restricted the acceptance of construction waste. In such circumstances construction waste has to go for recycling, which is as costly as to go for new material. Sustainable and practical solutions then have to: 1) maximize the reuse of construction waste during the project construction phase, and 2) optimize the material usage of the „proposed construction‟ in the design phase itself. To achieve both of these objectives, real-time information system that can forecast potential waste of given project/s with material properties, cost, time, life cycle, and manufacturer specifications is required. Building Information Modeling (BIM) is a relatively new and much unexplored area in construction waste management, which has immense potential with today‟s computing power and technology. BIM can be used to optimize construction material use (and reuse) by micromapping construction lifecycle with virtual resource management. An optimized building model can be obtained by simulating the objects and spaces in the BIM with a novel use of dynamics modeling techniques and multi-criteria decision making methods. In addition, the proposed system dynamics modeling approach allows real time optimization of material discrepancies due to changes in the scope of construction projects. BIM as a virtual construction tool, integrated with project scheduling tool and proposed simulation technique, will facilitate waste minimization, right at the source, and allows construction managers to pre-plan sustainable construction by reusing waste material throughout the project lifecycle.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A BIM-aided construction waste minimisation framework

a r t i c l e i n f o At present, there are insufficient design decision making tools to support effective construction waste minimisation evaluation and implementation throughout all design stages. A limited but growing body of recent literature suggests that building information modelling has the potential to assist architects to minimise design waste on their projects. The research reported ...

متن کامل

Elimination of Waste and Inefficient Facilities in Existing Buildings for Sustainability in Developing Nations

A major reason why many developing nations have not made significant advancement in sustainable development (SD) agenda is the neglect of existing building stock which forms the bulk of built assets. Although sustainable development is a universal challenge, it cannot be approached in the same way for all nations, but rather practical response can be defined nationally or locally. This paper re...

متن کامل

Waste Management of Building Ceramic Materials Using the DfD Technique: Sustainable Development and Environmentally Friendly

Nowadays, in modern societies, growing activities in construction affairs and their economic development have been resulted construction wastes and so much demolition in the past three decades. Most of these wastes have not been treated and therefore caused severe damages to the environment. In this research, after reviewing construction and demolition management methods and their accesso...

متن کامل

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

Sustainable solid waste management: An appraisal of institutional limitations

This study investigates the underlying factors elucidating why solid waste management in Eldoret Town, Kenya, has up to now remained inadequate notwithstanding the existing legal framework that mandates the County Government of Uasin Gishu to ensure that all residents have access to a clean and healthy environment. The study adopted a descriptive research design. While, primary data were collec...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011