BACKGROUND In 2005-2006 when this initiative was being planned, preterm birth had risen steadily by more than 30% over the previous two decades in the United States, peaking at 12.8% in 2006. Since then, the preterm birth rate has decreased more than 8% to 11.7% in 2011. Despite the decrease, nearly half a million babies are born preterm each year, and 70% of these are late preterm.
منابع مشابه
THE DISTURBANCES IN IRON TRANSPORT AND STORES AND TOTAL FREE RADICAL TRAPPING ABILITY OF BLOOD PLASMA IN BABIES WITH MITOCHONDRIAL ENCEPHALO MYOPATHIES
Babies with mitochondrial encephalomyopathies had higher ferritin levels than controls. Although plasma iron levels were simi lar in both groups, babies with mitochondrial encephalomyopathies had lower transferrin levels. Thiobarbituric acid reactive substances in plasma of babies with mitochondrial encephalomyopathies were higher thun in controls suggesting increased lipid oxidation. We s...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملLot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors
This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...