Can We Increase the Usability of Real Time Scheduling Theory? The Cheddar Project
نویسندگان
چکیده
The Cheddar project deals with real time scheduling theory. Many industrial projects do not perform performance analysis with real time scheduling theory even if the demand for the use of this theory is large. The Cheddar project investigates why real time scheduling theory is not used and how its usability can be increased. The Cheddar project was launched at the University of Brest in 2002. This article presents a summary of its contributions and ongoing works.
منابع مشابه
A Project Scheduling Method Based on Fuzzy Theory
In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modif...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
متن کاملModified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations
In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...
متن کاملThe resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study
Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...
متن کاملTowards User-Level Extensibility of an Ada Library: An Experiment with Cheddar
In this article, we experiment a way to extend an Ada library called Cheddar. Cheddar provides a domain specific language. Programs written with this domain specific language can be interpreted in order to perform real time scheduling analysis of real time systems. By the past, different projects showed that the Cheddar programming language is useful for the modeling of real time schedulers. Bu...