Energy Aware Scheduling for Weighted Completion Time and Weighted Tardiness
نویسندگان
چکیده
The ever increasing adoption of mobile devices with limited energy storage capacity, on the one hand, and more awareness of the environmental impact of massive data centres and server pools, on the other hand, have both led to an increased interest in energy management algorithms. In this talk we will present several new constant factor approximation algorithms for energy aware scheduling problems where the objective is to minimize a weighted sum of the weighted completion time of the jobs and the total cost of energy consumed, in a one machine non-preemptive setting, while allowing release dates and deadlines. Unlike previous known algorithms these new algorithms can handle general job-dependent energy cost functions, in particular these functions can be non-monotonic and even non-convex. Our algorithms also extend to approximating weighted tardiness plus energy cost, an inherently more difficult problem that has not been addressed in the literature. We also present experimental results that show that our algorithms perform very close to optimal, and that they can be improved and extended to the on-line setting.
منابع مشابه
A Multi-Objective Particle Swarm Optimization Algorithm for a Possibilistic Open Shop Problem to Minimize Weighted Mean Tardiness and Weighted Mean Completion Times
We consider an open shop scheduling problem. At first, a bi-objective possibilistic mixed-integer programming formulation is developed. The inherent uncertainty in processing times and due dates as fuzzy parameters, machine-dependent setup times and removal times are the special features of this model. The considered bi-objectives are to minimize the weighted mean tardiness and weighted mean co...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...
متن کاملMinimizing the energy consumption and the total weighted tardiness for the flexible flowshop using NSGA-II and NRGA
This paper presents a bi-objective MIP model for the flexible flow shop scheduling problem (FFSP) in which the total weighted tardiness and the energy consumption are minimized simultaneously. In addition to considering unrelated machines at each stage, the set-up times are supposed to be sequence- and machine-dependent, and it is assumed that jobs have different release tim...
متن کاملA fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times
This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flowtime through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters with it, this is why in recent decades extensive researches have been done on scheduling issues. A type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1110.0685 شماره
صفحات -
تاریخ انتشار 2011