An Approach to the Representation of Gradual Uncertainty Resolution in Stochastic Multiperiod Planning
نویسندگان
چکیده
An Approach to the Representation of Gradual Uncertainty Resolution in Stochastic Multiperiod Planning Vicente Rico-Ramirez, Ignacio E. Grossmann, Bora Tarhan, Salvador Hernández-Castro and Juan G. Segovia-Hernández Instituto Tecnologico de Celaya, Av. Tecnologico y Garcia Cubas S/N, Celaya,Gto., 38060, Mexico, [email protected] Carnegie Mellon Uiniversity, Pittsburgh, PA, 15213, USA Universidad de Guanajuato, Facultad de Quimica, Guanajuato, Gto., 36050, Mexico
منابع مشابه
Stochastic Multiperiod Decision Making Framework of an Electricity Retailer Considering Aggregated Optimal Charging and Discharging of Electric Vehicles
This paper proposes a novel decision making framework for an electricity retailer to procure its electric demand in a bilateral-pool market in presence of charging and discharging of electric vehicles (EVs). The operational framework is a two-stage programming model in which at the first stage, the retailer and EV aggregator do their medium-term planning. Determination of retailer's optimum sel...
متن کاملA Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty
In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...
متن کاملA New Model Considering Uncertainties for Power Market
Medium-term modeling of electricity market has essential role in generation expansion planning. On the other hand, uncertainties strongly affect modeling and consequently, strategic analysis of generation firms in the medium term. Therefore, models considering these uncertainties are highly required. Among uncertain variables considered in the medium term generation planning, demand and hyd...
متن کاملA stochastic model for operating room planning under uncertainty and equipment capacity constraints
In the present economic context, the operating theater is considered as a critical activity in health care management. This paper describes a model for operating room (OR) planning under constraint of a unique equipment. At first level we schedule elective surgeries under the uncertainty of using a unique equipment. At the second level we consider emergency surgeries, and at the third le...
متن کاملA Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کامل