Overview of the ARISE project

نویسندگان

  • Els den Os
  • Lou Boves
  • Lori Lamel
  • Paolo Baggia
چکیده

The LE-3 project ARISE (Automatic Railway Information Sys­ tems for Europe) ran from October 1996 through December 1998. Four prototypes of train timetable information systems for three different languages were developed, tested, and validated: Italian (based on technology developed by CSELT), French (two systems, one based on Philips technology, the other on technology by LIMSI), and Dutch (based on Philips technol­ ogy). The goal of ARISE was to improve the basic technology and to enhance our general understanding of the issues involved in actual deployment of spoken language dialogue systems for restricted domain information. This paper summarises the main findings of the project in terms of speech recognition, dialogue state dependent language modelling, dialogue control, informa­ tion presentation, system output, evaluation of spoken dialogue systems, and operational issues.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Overview of Challenges and Errors in Sampling and Recombination of Gas Condensate Fluids

A proper understanding of reservoir fluid phase behavior is the first crucial step in the development and production of an oil/gas field. This paper addresses the challenges and errors associated with the fluid sampling that may arise before, during and after the sampling operation. For this aim, DST and PVT data of exploration and production wells of a supergiant offshore gas condensate reserv...

متن کامل

Improvement of project management office performance: An empirical investigation of effective factors in iranian construction industry

Project management office (PMO) is a new emerging concept in Iranian construction industry. Executives expect this organizational unit to add value to the business, and meet the demands of stakeholders by performing specialized tasks ranging from providing project management support to portfolio management. In this regard, PMO managers have long faced the question of how to improve the performa...

متن کامل

Resource leveling scheduling by an ant colony-based model

In project scheduling, many problems can arise when resource fluctuations are beyond acceptable limits. To overcome this, mathematical techniques have been developed for leveling resources. However, these produce a hard and inflexible approach in scheduling projects. The authors propose a simple resource leveling approach that can be used in scheduling projects with multi-mode execution activit...

متن کامل

Prioritizing Projects Using Hybrid Methods of Six Sigma, TRIZ and Gray ANP

In this study due to the increasing amount of quality problems that arise in organizations, some of these problems in Tehran municipality are being tested. First, a large number of projects that need to be improved are defined by one of multiple decision-making method of MCDM named ANP priorities. Then, the most important projects have been selected. For doing this project, some problems arise ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999