“Master Production Schedule Stability Under Conditions of Finite Capacity”
نویسندگان
چکیده
In this article, we propose a new way to improve master production schedule (MPS) stability under conditions of finite capacity. The purpose is to optimize product availability and customer service for typical situations encountered in the consumer goods industry. Using a comprehensive MPS model, we conduct a simulation study with experimental design to identify factors having a significant influence on MPS stability. Then we perform sensitivity analysis on select factors that hold the greatest promise for improvement by employing a simple predictive equation. Finally, we test a different way to plan safety stocks and report the results. In general, elimination of forecast bias and choice of safety stock method both are particularly important for improving MPS stability and ultimately customer service.
منابع مشابه
Lot-sizing Rule and Freezing the Master Production Schedule under Capacity Constraint and Deterministic Demand
This paper investigates the performance impact of lot-sizing rule (LSR) selection and freezing of the master production schedule (MPS) in multi-item single-level systems with a single resource constraint under deterministic demand. The results of the study show that the selection of LSRs and the parameters for freezing the MPS have a significant impact on total cost, schedule instability, and t...
متن کاملFreezing the master production schedule under single resource constraint and demand uncertainty
This paper investigates the impact of freezing the master production schedule (MPS) in multi-item single-level systems with a single resource constraint under demand uncertainty. It also examines the impact of environmental factors on the selection of MPS freezing parameters. A computer model is built to simulate master production scheduling activities in a multi-item system under a rolling tim...
متن کاملAn Application of Master Schedule Smoothing and Planned Lead Time Control
M ake-to-order (MTO) manufacturers must ensure concurrent availability of all parts required for production, as any unavailability may cause a delay in completion time. A major challenge for MTO manufacturers operating under high demand variability is to produce customized parts in time to meet internal production schedules. We present a case study of a producer of MTO offshore oil rigs that hi...
متن کاملOn Sum and Stability of Continuous $G$-Frames
In this paper, we give some conditions under which the finite sum of continuous $g$-frames is again a continuous $g$-frame. We give necessary and sufficient conditions for the continuous $g$-frames $Lambda=left{Lambda_w in Bleft(H,K_wright): win Omegaright}$ and $Gamma=left{Gamma_w in Bleft(H,K_wright): win Omegaright}$ and operators $U$ and $V$ on $H$ such that $Lambda U+Gamma V={Lambda_w U+Ga...
متن کاملA PRACTICAL WEIGHT OPTIMIZATION FOR MOMENT FRAMES UNDER COMBINED LOADING
This article introduces three simple ideas that lead to the efficient design of regular moment frames. The finite module concept assumes that the moment frame may be construed as being composed of predesigned, imaginary rectangular modules that fit into the bays of the structure. Plastic design analysis aims at minimizing the demand-capacity ratios of elements of ductile moment frames by induci...
متن کامل