Estimating with Enhanced Object Points vs. Function Points

نویسنده

  • Erik Stensrud
چکیده

In the research community Function Points is considered as a de facto standard. Even according to Gartner Group "function points will provide the primary means for measuring application size, reaching a penetration of approximately 50% of development organisations by the year 2000" (Hotle, 1996). We do not know what sources this conjecture is based upon. However, we observe that in many major companies, like Andersen Consulting, Function Points are not used to size software for estimating purposes. In stead, various kinds of what we refer to as Enhanced Object Points (EOP) are used by project managers and other practitioners to size the product and estimate the effort. This paper describes EOP and compares the two metrics and points out some reasons why many practitioners may prefer Enhanced Object Points to Function Points.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Estimating Size and E ort for Object Oriented Systems

This paper presents a method for estimating the development size and eeort of object oriented software. In an approach analogous to function points, counts of the elements in a static object model are combined to produce a composite measure. Rules are proposed for counting \Object Oriented Function Points" from an object model, and several questions are identiied for empirical research. A key a...

متن کامل

Long-term Outcomes after Primary Radial Head Resection Arthroplasty vs. Acute Radial Head Resection vs. Secondary Prosthetic Removal in Comminuted Radial Head Fractures

Background: Aim of this study was to compare the clinical and radiological long-term outcomes following operativetreatment of comminuted radial head fractures using 1) primary radial head resection arthroplasty, 2) acute radial headresection, or 3) necessary secondary prosthetic removal. Additionally, we evaluated complex radial head fracturescombined with elbow dislocation and verified the hyp...

متن کامل

A HYBRID SUPPORT VECTOR REGRESSION WITH ANT COLONY OPTIMIZATION ALGORITHM IN ESTIMATION OF SAFETY FACTOR FOR CIRCULAR FAILURE SLOPE

Slope stability is one of the most complex and essential issues for civil and geotechnical engineers, mainly due to life and high economical losses resulting from these failures. In this paper, a new approach is presented for estimating the Safety Factor (SF) for circular failure slope using hybrid support vector regression (SVR) and Ant Colony Optimization (ACO). The ACO is combined with the S...

متن کامل

Adapting Function Points to Object-Oriented Information Systems

The object oriented paradigm has become widely used to develop large information systems. This paper presents a method for estimating the size and eeort of developing object oriented software. The approach is analogous to function points, and it is based on counting rules that pick up the elements in a static object model and combine them in order to produce a composite measure. Rules are propo...

متن کامل

Using Web Objects for Estimating Software Development Effort for Web Applications

Web development projects are certainly different from traditional software development projects and, hence, require differently tailored measures for accurate effort estimation. In this paper, we investigate the suitability of a newly proposed size measure for web development projects: Web Objects. Web Objects have been specifically developed for sizing web applications and used for estimating ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009