Fast Iterative Improvement Methods for Project Scheduling under Partially Renewable Resources

نویسنده

  • Andreas Schirmer
چکیده

It is well-known that for many project scheduling problems the space AS of active schedules contains at least one optimal solution for each feasible instance, so restricting heuristic construction methods to AS will improve algorithmic efficiency without foresaking the chance to eventually find an optimal schedule. Yet, for some problems such results are not directly applicable. We address one such problem, namely the resource-constrained project scheduling problem under partially renewable resources (RCPSP/Π). Here delaying certain activities may yield better solutions than starting each activity as soon as possible. Since AS is the smallest space guaranteed to contain optimal schedules, it would be desirable to devise methods which sample AS, or at least the nextlarger space SAS of semi-active schedules. However, no such methods are in sight because the "delay problem" of which activities should be delayed and by how many periods cannot be properly addressed during the construction process, when not all remaining resource capacities are known. Indeed, all priority rule-based construction methods for the RCPSP/Π use scheduling schemes which sample the next-larger space FS of feasible schedules. But while the delay problem withstands solution during the construction of schedules, it can be solved afterwards, suggesting the idea of fast iterative improvement algorithms which use appropriate shift operations to improve heuristically constructed feasible schedules. We develop several such approaches, using local and global shifts, and evaluate the effect of different design choices on effectiveness and efficiency of the algorithms. Computational results validate the efficacy of our approach.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A scatter search algorithm for project scheduling under partially renewable resources

In this paper we develop a heuristic algorithm, based on Scatter Search, for project scheduling problems under partially renewable resources. This new type of resource can be viewed as a generalization of renewable and non-renewable resources, and is very helpful in modelling conditions that do no fit into classical models, but which appear in real timetabling and labor scheduling problems. The...

متن کامل

Adaptive Control Schemes Applied to Project Scheduling With Partially Renewable Resources

For most computationally intractable problems there exists no heuristic that is equally effective on all instances. Rather, any given heuristic may do well on some instances but will do worse on others. Indeed, even the 'best' heuristics will be dominated by others on at least some subclasses of instances. It thus seems worthwhile to identify for each instance anew a heuristic that is appropria...

متن کامل

An Optimal NPV Project Scheduling with Fixed Work Content and Payment on Milestones

    Project scheduling   Net present value   We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a t...

متن کامل

GRASP and path relinking for project scheduling under partially renewable resources

Recently, in the field of project scheduling problems the concept of partially renewable resources has been introduced. Theoretically, it is a generalization of both renewable and non-renewable resources. From an applied point of view, partially renewable resources allow us to model a large variety of situations that do not fit in classical models, but can be found in real problems in timetabli...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999