Effect of Inspection Policies and Residual Value of Collected Used Products: A Mathematical Model and Genetic Algorithm for a Closed-Loop Green Manufacturing System

نویسنده

  • Byung Duk Song
چکیده

In the green manufacturing system that pursues the reuse of used products, the residual value of collected used products (CUP) hugely affects a variety of managerial decisions to construct profitable and environmental remanufacturing plans. This paper deals with a closed-loop green manufacturing system for companies which perform both manufacturing with raw materials and remanufacturing with collected used products (CUP). The amount of CUP is assumed as a function of buy-back cost while the quality level of CUP, which means the residual value, follows a known distribution. In addition, the remanufacturing cost can differ according to the quality of the CUP. Moreover, nowadays companies are subject to existing environment-related laws such as Extended Producer Responsibility (EPR). Therefore, a company should collect more used products than its obligatory take-back quota or face fines from the government for not meeting its quota. Through the development of mathematical models, two kinds of inspection policies are examined to validate the efficiency of two different operation processes. To find a managerial solution, a genetic algorithm is proposed and tested with numerical examples.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Mathematical Formulation and Solving of Green Closed-loop Supply Chain Planning Problem with Production, Distribution and Transportation Reliability

In this paper, developed a new multi-product, multi-period, and multi-level closed-loop green supply chain planning model under uncertain conditions. The formulated model consists of five objective functions, which minimize the cost of the supply chain, minimize the CO2 emission of transportation vehicles, maximize the reliability of manufacturing and distribution centers, maximize t...

متن کامل

Development of closed-loop supply chain mathematical model (cost-benefit-environmental effects) under uncertainty conditions by approach of genetic algorithm

In the current world, the debate on the reinstatement and reuse of consumer prod-ucts has become particularly important. Since the supply chain of the closed loop is not only a forward flow but also a reverse one; therefore, companies creating integ-rity between direct and reverse supply chain are successful. The purpose of this study is to develop a new mathematical model for closed loop suppl...

متن کامل

A Multi-Objective Fuzzy Approach to Closed-Loop Supply Chain Network Design with Regard to Dynamic Pricing

During the last decade, reverse logistics networks received a considerable attention due to economic importance and environmental regulations and customer awareness. Integration of leading and reverse logistics networks during logistical network design is one of the most important factors in supply chain. In this research, an Integer Linear Programming model is presented to design a multi-layer...

متن کامل

Fuzzy Mathematical Model For A Lot-Sizing Problem In Closed-Loop Supply Chain

The aim of lot sizing problems is to determine the periods where production takes place and the quantities to be produced in order to satisfy the customer demand while minimizing the total cost. Due to its importance on the efficiency of the production and inventory systems, Lot sizing problems are one of the most challenging production planning problems and have been studied for many years wit...

متن کامل

Benders decomposition algorithm for a green closed-loop supply chain under a build-to-order environment

Nowadays, researches pay more attention to environmental concerns consisted of various communities. This study proposes a multi-echelon, multi-period closed-loop supply chain (CLSC). A comprehensive model considers the selection of selection of technology and environmental effects. The supply chain is under a build-to-order (BTO) environment. So, there is not a final product inventory. Also, th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017