Planning as heuristic search
نویسندگان
چکیده
In the AIPS98 Planning Contest, the HSP planner showed that heuristic search planners can be competitive with state-of-the-art Graphplan and SAT planners. Heuristic search planners like HSP transform planning problems into problems of heuristic search by automatically extracting heuristics from Strips encodings. They differ from specialized problem solvers such as those developed for the 24-Puzzle and Rubik’s Cube in that they use a general declarative language for stating problems and a general mechanism for extracting heuristics from these representations. In this paper, we study a family of heuristic search planners that are based on a simple and general heuristic that assumes that action preconditions are independent. The heuristic is then used in the context of best-first and hill-climbing search algorithms, and is tested over a large collection of domains. We then consider variations and extensions such as reversing the direction of the search for speeding node evaluation, and extracting information about propositional invariants for avoiding dead-ends. We analyze the resulting planners, evaluate their performance, and explain when they do best. We also compare the performance of these planners with two state-of-the-art planners, and show that the simplest planner based on a pure best-first search yields the most solid performance over a large set of problems. We also discuss the strengths and limitations of this approach, establish a correspondence between heuristic search planning and Graphplan, and briefly survey recent ideas that can reduce the current gap in performance between general heuristic search planners and specialized solvers. 2001 Elsevier Science B.V. All rights reserved.
منابع مشابه
Considering Production Planning in the Multi-period Inventory Routing Problem with Transshipment between Retailers
Generally, the inventory routing problem occurs in a supply chain where customers consider the supplier responsible for inventory replenishment. In this situation, the supplier finds the answer to questions regarding the time and quantity of delivery to the customer as well as the sequence of customers in the routes. Considering the effect of production decisions on answering these questions, t...
متن کاملNetwork Planning Using Iterative Improvement Methods and Heuristic Techniques
The problem of minimum-cost expansion of power transmission network is formulated as a genetic algorithm with the cost of new lines and security constraints and Kirchhoff’s Law at each bus bar included. A genetic algorithm (GA) is a search or optimization algorithm based on the mechanics of natural selection and genetics. An applied example is presented. The results from a set of tests carried ...
متن کاملThe Fast Downward Planning System
Fast Downward is a classical planning system based on heuristic search. It can deal with general deterministic planning problems encoded in the propositional fragment of PDDL2.2, including advanced features like ADL conditions and effects and derived predicates (axioms). Like other well-known planners such as HSP and FF, Fast Downward is a progression planner, searching the space of world state...
متن کاملSolving a Multi-Item Supply Chain Network Problem by Three Meta-heuristic Algorithms
The supply chain network design not only assists organizations production process (e.g.,plan, control and execute a product’s flow) but also ensure what is the growing need for companies in a longterm. This paper develops a three-echelon supply chain network problem including multiple plants, multiple distributors, and multiple retailers with amulti-mode demand satisfaction policy inside of pro...
متن کاملA Hybrid Meta-heuristic for the Dynamic Layout Problem with Transportation System Design
This paper primarily presents a comprehensive dynamic layout design model which integrates layout and transportation system design via considering more realistic assumptions, such as taking account of fixed-position departments and distance between departments that endanger each other. In addition, specific criteria such as capacity, cost and reliability of facilities are considered in transpor...
متن کاملA Survey of Heuristics for Domain-Independent Planning
Increasing interest has been devoted to Planning as Heuristic Search over the years. Intense research has focused on deriving accurate heuristics in polynomial computational time for domain-independent planning. This paper reports on an extensive survey and analysis of research work related to heuristic derivation techniques for state space search planning, as well as other planning paradigms. ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Artif. Intell.
دوره 129 شماره
صفحات -
تاریخ انتشار 2001