Solving “Resource Constrained Project Scheduling Problem” (RCPSP) with Bench Marked Hybrid Algorithm’s
نویسنده
چکیده
In the paper, we give illustrated reviews, new approaches and results of how rcps –problems are being solved with Hybrid algorithm’s. Firstly, considering Hybrid Genetic Algorithm (HGA), Vicente a et al 2007, introducing many changes in Genetic algorithm (GA) paradigm, resulting in HGA giving fast and high quality algorithms out performing state-of-the-art-algorithm (SOTAA). for rcps-problem. Secondly, Lin a et al 2005 claims a Hybrid Meta-heuristic ANGEL for rcpsproblem. ANGEL combines ant colony optimization (ACO), GA and Local search strategy. For ANGEL to proceed it firstly searches for solution space and generates activity lists for the initial population from ACO. With GA following execution and pheromone is updated in ACO. Proposing an efficient local search method when ACO and GA reaching optimum solutions. Thirdly, Sonda Elloumi a et al 2009 implementing multi-mode rcps-problem with Hybrid rank based evolutionary algorithm (EA) , proposing i)transforming single objective multi-mode rcpsproblem to bi-objective to cope with potential violation to non-renewable resource constraints and relaxing latter constraints, ii) fitness function on an adaptive relying clustering method. Lastly, Ling Wang et al 2012 presents Hybrid estimation distribution algorithm (HEDA), here individuals encode based on extended activity list (EAL) and then decoding with serial generation scheme (SGS).
منابع مشابه
Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
متن کاملA UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...
متن کاملROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH
This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...
متن کاملA THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...
متن کامل