Scheduling internal audit activities: a stochastic combinatorial optimization problem
نویسندگان
چکیده
The problem of finding the optimal timing of audit activities within an organisation has been addressed by many researchers. We propose a stochastic programming formulation with Mixed Integer Linear Programming (MILP) and Constraint Programming (CP) certainty-equivalent models. In experiments neither approach dominates the other. However, the CP approach is orders of magnitude faster for large audit times, and almost as fast as the MILP approach for small audit times. Roberto Rossi is supported by Science Foundation Ireland under Grant No. 03/CE3/I405 as part of the Centre for Telecommunications Value-Chain-Driven Research (CTVR) and Grant No. 05/IN/I886. S. Armagan Tarim and Brahim Hnich are supported by the Scientific and Technological Research Council of Turkey (TUBITAK) under Grant No. SOBAG-108K027. R. Rossi ( ) · S. Prestwich Cork Constraint Computation Centre, University College, 14 Washington St. West, Cork, Ireland e-mail: [email protected] S. Prestwich e-mail: [email protected] R. Rossi Centre for Telecommunication Value-Chain Driven Research, University College, Dublin, Ireland e-mail: [email protected] S.A. Tarim · S. Karacaer Department of Management, Hacettepe University, Ankara, Turkey S.A. Tarim e-mail: [email protected] S. Karacaer e-mail: [email protected] B. Hnich Faculty of Computer Science, Izmir University of Economics, Izmir, Turkey e-mail: [email protected] 326 J Comb Optim (2010) 19: 325–346 This work generalises a previous approach by relaxing the assumption of instantaneous audits, and by prohibiting concurrent auditing.
منابع مشابه
Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملThree Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملThe Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملOrdinal comparison of heuristic algorithms using stochastic optimization
The performance of heuristic algorithms for combinatorial optimization is often sensitive to problem instances. In extreme cases, a specialized heuristic algorithm may perform exceptionally well on a particular set of instances while fail to produce acceptable solutions on others. Such a problem-sensitive nature is most evident in algorithms for combinatorial optimization problems such as job s...
متن کاملAddressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm
Nowadays, there is much attention for planning of container terminals in the global trade centers. The high cost of quay cranes motivates both scholars and industrial practitioners especially in the last decade to develop novel optimization models to address this dilemma. This study proposes a coordinated optimization model to cover both Quay Crane Scheduling Problem (QCSP) and Quay Crane Assig...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Comb. Optim.
دوره 19 شماره
صفحات -
تاریخ انتشار 2010