TCBB Scheme: Applications to Single Machine Job Sequencing Problems
نویسندگان
چکیده
Transpose-and-Cache Branch-and-Bound (TCBB) has shown promise in solving large single machine quadratic penalty problems. There exist other classes of single machine job sequencing problems which are of more practical importance and which are also of considerable interest in the area of AI search. In the weighted earliness tardiness problem (WET), the best known heuristic estimate is not consistent; this is contrary to the general belief about relaxation-based heuristic. In the quadratic penalty problem involving setup times (SQP) of jobs, the evaluation function is non-order-preserving In this paper, we present the TCBB scheme to solve these problems as well. Experiments indicate that (i) for the WET problem, the TCBB scheme is highly effective in solving large problem instances and (ii) for the SQP problem, it can solve larger instances than algorithm GREC in a given available memory.
منابع مشابه
A Single Machine Sequencing Problem with Idle Insert: Simulated Annealing and Branch-and-Bound Methods
In this paper, a single machine sequencing problem is considered in order to find the sequence of jobs minimizing the sum of the maximum earliness and tardiness with idle times (n/1/I/ETmax). Due to the time complexity function, this sequencing problem belongs to a class of NP-hard ones. Thus, a special design of a simulated annealing (SA) method is applied to solve such a hard problem. To co...
متن کاملA Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem
Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...
متن کاملA Fuzzy Algorithm for the m-Machine, n-Job Flow Shop Sequencing Problem
Flow shop sequencing problem is included in NP-hard problems and a number of heuristic methods have been developed to solve it. Most of these methods are offered for the crisp processing time. However fuzzy algorithm is appropriate for the problems with fuzzy processing time. This paper presents a method in which an algorithm is used to minimize make span of flow shop with fuzzy processing time...
متن کاملSolving Single Machine Sequencing to Minimize Maximum Lateness Problem Using Mixed Integer Programming
Despite existing various integer programming for sequencing problems, there is not enoughinformation about practical values of the models. This paper considers the problem of minimizing maximumlateness with release dates and presents four different mixed integer programming (MIP) models to solve thisproblem. These models have been formulated for the classical single machine problem, namely sequ...
متن کاملMinimizing the Mean Tardiness in A N1 Sequencing Problem
This paper considers the problem of minimizing the mean tardiness of N jobs when the jobs are scheduled on a single machine. A simple algorithmic procedure is develop to obtain an optimal or a near optimal sequence for the N jobs while considering an equal penalty cost incurred to each job delivered later than its due date. The developed algorithm is applied to the several test problems. The re...
متن کامل