Fuzzy Gupta Scheduling for Flow Shops with More Than Two Machines

نویسندگان

  • Tzung-Pei Hong
  • Tzung-Nan Chuang
چکیده

In the past, we demonstrated how fuzzy concepts can easily be used in the Johnson algorithm for managing uncertain scheduling on two-machine flow shops. This paper extends these concepts to fuzzy flow shops with more than two machines. A new fuzzy heuristic flow-shop scheduling algorithm (the fuzzy Gupta algorithm) is then designed since optimal solutions seem unnecessary for uncertain environments. Also, the conventional Gupta algorithm is shown as a special case of the fuzzy Gupta algorithm with special membership functions being assigned.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fuzzy palmer Scheduling for Flow Shops with More than Two Machines

In the past, we have demonstrated how fuzzy concepts can easily be used in the Johnson algorithm to manage uncertain scheduling on two-machine flow shops. This paper extends application to fuzzy flow shops with more than two machines. A new fuzzy heuristic flow-shop scheduling algorithm (the fuzzy Palmer algorithm) is then designed since optimal solutions seem unnecessary for uncertain environm...

متن کامل

Modeling and scheduling no-idle hybrid flow shop problems

Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...

متن کامل

Electromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and ‎tardiness‎

‎In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...

متن کامل

Optimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time

One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs a...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012