Analytical Tunnel-boring Machine Pose Precision and Sensitivity Evaluation for Underground Tunnelling

نویسندگان

  • D. Li
  • S. Mao
  • M. Lu
  • X. Shen
چکیده

Practical Tunnel-boring Machine (TBM) guidance systems usually use sophisticated instruments to obtain the orientation of the TBM. These systems require frequent calibration and work shutdown, making the procedure complex and time consuming. Besides, the majority of current TBM guidance solutions cannot provide the position of the invisible cutter head analytically including commonly used laser point tracking system. This makes it impossible to check the accuracy of the TBM positioning for ensuring the quality of the tunnel being installed in the ground. To address the problem, this research proposes an analytical approach to quantify the accuracy of the TBM position and orientation estimation based on a previously proposed survey-based TBM guidance system. The coordinates for the cutter head center are derived through error propagation based on defining geometric constraints and applying computing algorithms, such as the layout configuration of the prisms mounted on the TBM and the relative position of the cutter head center. The paper also provides a thorough analysis of the sensitivity of the solution with regards to certain configurations based on underlying formulas. To verify the results, a tunnelling experiment was also conducted based on a 1:20 scaled TBM model with its cutter head visible. The proposed method provides a valuable approach to evaluate the accuracy of the cutter head position estimation and potentially enable the operators to control and guide the tunnelling process in the field.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Tunnel boring machine positioning automation in tunnel construction

Purpose Tunnel construction using a tunnel boring machine (TBM) entails precise machine positioning and guidance in the underground space. In contrast to traditional laser-based machine guidance solutions, the proposed research aims to develop an automation alternative to facilitate TBMguidance and as-built tunnel alignment survey during tunnelling operations. Method A fully automated system is...

متن کامل

A Systematic Approach to Construction Risk Assessment for the Drainage Tunnel of Kai Tak Transfer Scheme of Hong Kong

INTRODUCTION The issue of increasing population is a problem prevailing in all urban cities in the world. Urban congestion in Hong Kong is particularly amplified by its hilly terrain. A clear trend can be seen in recent decades all over the world with networks of transportation as well as provisions of utilities services seeking underground solutions, which in some cases is the only feasible op...

متن کامل

Seismic Imaging from a TBM

Seismic monitoring from the head of a tunnel-boring machine (TBM) enables improved assessment of the risks associated with the tunnel-boring process. The monitoring system provides a live image of ground conditions along the trajectory followed by the TBM and detects local heterogeneities such as boulders, foundations, and other obstacles that commonly pass undetected using local geotechnical t...

متن کامل

Geological Hazards analysis in Urban Tunneling by EPB Machine (Case study: Tehran subway line 7 tunnel)

Technological progress in tunneling has led to modern and efficient tunneling methods in vast underground spaces even under inappropriate geological conditions. Identification and access to appropriate and sufficient geological hazard data are key elements to successful construction of underground structures. Choice of the method, excavation machine, and prediction of suitable solutions to over...

متن کامل

Simulation of tunnel boring machine utilization: A case study

Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015