Setup and Validation of Flow Cell Systems for Biofouling Simulation in Industrial Settings
نویسندگان
چکیده
A biofouling simulation system consisting of a flow cell and a recirculation tank was used. The fluid circulates at a flow rate of 350 L· h⁻¹ in a semicircular flow cell with hydraulic diameter of 18.3 mm, corresponding to an average velocity of 0.275 m· s⁻¹. Using computational fluid dynamics for flow simulation, an average wall shear stress of 0.4 Pa was predicted. The validity of the numerical simulations was visually confirmed by inorganic deposit formation (using kaolin particles) and also by direct observation of pathlines of tracer PVC particles using streak photography. Furthermore, the validity of chemostat assumptions was verified by residence time analysis. The system was used to assess the influence of the dilution rate on biofilm formation by Escherichia coli JM109(DE3). Two dilution rates of 0.013 and 0.0043 h⁻¹ were tested and the results show that the planktonic cell concentration is increased at the lower dilution rate and that no significant changes were detected on the amount of biofilm formed in both conditions.
منابع مشابه
New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...
متن کاملMeta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...
متن کاملPart-level Sequence Dependent Setup Time Reduction in CMS
This paper presents the idea of creating cells while reducing part-level sequence-dependent setup time in general cellular manufacturing systems (CMS). Setup time reduction in CMS has gained modest attention in the literature. This could be attributed to the fact that the fundamental problem in cell formation in CMS has been mainly related to material handling and machine utilization while setu...
متن کاملStudy on implementation of one-piece lean line design using simulation techniques: A practical approach
This paper discusses the simulation study carried out for proposing one-piece lean line layout with features of Lean Manufacturing. The lean initiatives that can be addressed are, introducing Kanban replenishment sys-tem, better work-in-process, changing the layout, visual management techniques, standardized work for the re-duction of cycle time, number of workers, number of setups. To improve ...
متن کاملA comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times
In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
دوره 2012 شماره
صفحات -
تاریخ انتشار 2012