An NPV Optimization Model for Closed-Loop Supply Chain Network Design and Planning

نویسنده

  • Nahid Afia
چکیده

Corresponding Author: Al-Ashhab Mohamed Sayed Department of Mechanical Engineering, College of Engineering and Islamic Architecture, Umm Al-Qura University, Makkah, Saudi Arabia Email: [email protected] Abstract: As the importance of forward-reverse logistics increases, attention will be focused on parameters which affect Net Present Value (NPV) of the whole system, aiming at considering the time value of money in planning. In this research, an NPV optimization model for multi-period multi-product closed-loop supply chain network design and planning is developed to maximize the total NPV. The effect of interest rates on profit and performance, the effect of the maximum return ratio on the overall NPV of the system and the effect of interest rate change on the network configuration are studied.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Inexact-Fuzzy-Stochastic Optimization Model for a Closed Loop Supply Chain Network Design Problem

The development of optimization and mathematical models for closed loop supply chain (CLSC) design has attracted considerable interest over the past decades. However, the uncertainties that are inherent in the network design and the complex interactions among various uncertain parameters are challenging the capabilities of the developed tools. The aim of this paper, therefore, is to propose a n...

متن کامل

An Optimization Model for Multi-objective Closed-loop Supply Chain Network under uncertainty: A Hybrid Fuzzy-stochastic Programming Method

In this research, we address the application of uncertaintyprogramming to design a multi-site, multi-product, multi-period,closed-loop supply chain (CLSC) network. In order to make theresults of this article more realistic, a CLSC for a case study inthe iron and steel industry has been explored. The presentedsupply chain covers three objective functions: maximization ofprofit, minimization of n...

متن کامل

Design of An Integrated Robust Optimization Model for Closed-Loop Supply Chain and supplier and remanufacturing subcontractor selection

The development of optimization and mathematical models for closed loop supply chain (CLSC) design has attracted considerable interest over the past decades. However, the uncertainties that are inherent in the network design are challenging the capabilities of the developed tools. In CLSC Uncertainty in demand is major source of uncertainty. The aim of this paper, therefore, is to present a Rob...

متن کامل

Considering Pricing Problem in a Dynamic and Integrated Design of Sustainable Closed-loop Supply Chain Network

Flexible and dynamic supply chain network design problem has been studied by many researchers during past years. Since integration of short-term and long-term decisions in strategic planning leads to more reliable plans, in this paper a multi-objective model for a sustainable closed-loop supply chain network design problem is proposed. The planning horizon of this model contains multiple strate...

متن کامل

Sustainable closed-loop supply chain network design and operations planning considering human resource employment and training

Modeling and optimal solving of supply chain management problems lead to efficient decision making in strategic planning and supply chain operations, resulting in a competitive advantage. Today, with the planning of a sustainable supply chain, in addition to achieving economic goals, it is possible to meet social and environmental objectives and considerations. This research deal with sustainab...

متن کامل

A Bi-objective Mathematical Model for Closed-loop Supply Chain Network Design Problem

In this paper, a bi-objective mixed-integer linear optimization model for Closed-loop Supply Chain Network Design Problem (CLSCND) is developed. The proposed model includes both the forward and reverse directions and includes different types of facilities, namely, manufacturing/remanufacturing centers, warehouses, and disassembly centers. The first objective function tried to minimize the total...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017