On the Representation of Deadlines in a Rental Agreement
نویسندگان
چکیده
Many agreements and contracts contain deadlines. Because deadlines combine time and obligations, they are naturally studied by a combination of temporal logic with deontic logic [2]. A deadline, that φ should occur before δ , can be expressed as a formula which involves the ‘until’-operator: OBL(φUδ ). However, such a characterisation does not indicate what will happen after the deadline. Since deadlines can have different functions, it is likely that several notions of deadlines can be distinguished. Recently, we have presented a conceptual analysis of deadlines, based on the following parameters: whether we are dealing with an achievement or maintenance obligation. persistence of the obligation after the deadline, the choice of modal operators (permission or obligation) and the presence of an explicit or implicit sanction [3].
منابع مشابه
The Effect of Divorce on Urban Housing Costs in Iran: A Spatial Autocorrelation Model
In addition to traditional factors, demographic changes also depend on factors such as marriage and divorce. Yet only a few researchers investigated the impact of divorce on housing costs. The aim of this paper is to estimate the effect of divorce on housing costs in Iran. Doing so, we have applied a fixed Panel Spatial Autocorrelation model using the data from a set of Iranian provinces over t...
متن کاملOptimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time
One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs a...
متن کاملHeuristic Approach for Specially Structured Two Stage Flow Shop Scheduling to Minimize the Rental Cost, Processing Time, Set Up Time Are Associated with Their Probabilities Including Transportation Time and Job Weightage
The present paper is an attempt to develop a new heuristic algorithm, find the optimal sequence to minimize the utilization time of the machines and hence their rental cost for two stage specially structured flow shop scheduling under specified rental policy in which processing times and set up time are associated with their respective probabilities including transportation time. Further jo...
متن کاملInvestigating the distinction of commercial endorsement deadlines with civil commercial documents Iranian law and Geneva and UNCITRAL conventions
One of the common ways of transfer of commercial documents, ownership (bill of exchange, promissory notes and cheque) is endorsement. If the endorsement is subject to Commercial Code, it is considered a commercial endorsement. And if it is out of the scope of this Code, it should be regarded a normal and on the basis of request (claim) transfer. The question that arise here are “how long are th...
متن کاملCompilation a Model for Reporting Effectiveness for Stakeholders (Case Study in the Superum Audit Court)
Developing a Reporting Effectiveness Model for Stakeholders (Case Study in the Superum Audit Court) Abstract: The Court of Auditors' reports are an independent and rational assessment of the environment in the public sector and strive to enhance the value of government agencies through legislation and guidance to improve performance. The purpose of the present study is to conceptualize and ext...
متن کامل