Hierarchy probability cost analysis model incorporate MAIMS principle for EPC project cost estimation
نویسندگان
چکیده
Two new types of hierarchy probability cost analysis (HPCA) model incorporating money allocated is money spent (MAIMS) principle based on definite work breakdown structure (WBS) level for EPC (engineering, procurement and construction) projects are presented. The proposed models have skillfully solved dilemma to appropriate cost elements and maximize the efficiency of information for cost risk analysis. Macroscopic and microscopic risk analysis of the project cost elements are introduced for meaningful model input. The illustration of an actual bidding EPC project substantiates that proposed integrating HPCA-hierarchy MAIMS models have demonstrated effective and viable for EPC projects. 2011 Elsevier Ltd. All rights reserved.
منابع مشابه
Incorporating psychological influences in probabilistic cost analysis
Today's typical probabilistic cost analysis assumes an "ideal" project that is devoid of the human and organizational considerations that heavily influence the success and cost of real-world projects. In the real world “Money Allocated Is Money Spent” (MAIMS principle); cost underruns are rarely available to protect against cost overruns while task overruns are passed on to the total project co...
متن کاملQuantifying the Effects of Budget Management on Project Cost and Success
Today's typical probabilistic cost analysis assumes an "ideal" project in which whenever a cost element comes in low its savings are passed on where they are needed. Unfortunately in the real world “Money Allocated is Money Spent" (MAIMS principle), and cost underruns are rarely available to protect against cost overruns while task overruns are passed on to the total project cost. Realistic cos...
متن کاملA three- stage algorithm for software cost and time estimation in fuzzy environment
In this paper an efficient three- stage algorithm is developed for software production cost and time estimation. First stage includes a hybrid model composed of COCOMO and Function Points methods to increase estimation accuracy. Second stage encompasses paired comparisons matrix of analytical hierarchy process to determine amount of any resources consumed in each step of software production by ...
متن کاملSoftware Cost Estimation by a New Hybrid Model of Particle Swarm Optimization and K-Nearest Neighbor Algorithms
A successful software should be finalized with determined and predetermined cost and time. Software is a production which its approximate cost is expert workforce and professionals. The most important and approximate software cost estimation (SCE) is related to the trained workforce. Creative nature of software projects and its abstract nature make extremely cost and time of projects difficult ...
متن کاملAn Integrated Risk-Based Technique for Project Plan Selection
Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Expert Syst. Appl.
دوره 38 شماره
صفحات -
تاریخ انتشار 2011