A Cost-benefit Analysis of Tracking and Tracing Systems in Road Construction
نویسنده
چکیده
A major problem in road construction is the lack of timely and accurate information about the location and productivity of equipment. As a result, the productivity rate of certain types of construction equipment is low and equipment has to be hired in from third parties. Lack of co-ordination between the equipment department and the site manager is the major cause of these problems. In this paper, two basic solutions for this co-ordination problem are presented by using the Galbraith’ framework. A road construction company can either (1) reduce the need for information processing between the equipment department and the site manager or (2) increase its capacity to process information. The focus of this paper is on the second mechanism by analysing the role of tracking and tracing systems in increasing the capacity of information processing. The paper provides an improved understanding of the factors determining the costs and benefits of these systems in road construction. This cost-benefit analysis is based on the three elements of a tracking and tracing system: collecting, transmitting and analysing data. Empirical research was conducted at one of the biggest road construction firms in the Netherlands. The study shows that investments in tracking and tracing systems can be very efficient for equipment that has to be rented frequently.
منابع مشابه
A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...
متن کاملOptimal Design and Benefit/Cost Analysis of Reservoir Dams by Genetic Algorithms Case Study: Sonateh Dam, Kordistan Province, Iran
This paper presents a method concerning the integration of the benefit/cost analysis and the real genetic algorithm with various elements of reservoir dam design. The version 4.0 of HEC-RAS software and Hydro-Rout models have been used to simulate the region and flood routing in the reservoir of the dam, respectively. A mathematical programming has been prepared in MATLAB software and linked wi...
متن کاملOptimal Forest Road Density Based on Skidding and Road Construction Costs in Iranian Caspian Forests
Information on the productivity, costs and applications of the logging system is a key component in the evaluation of management plans for the rehabilitation and utilization of Caspian forests. Skidding and road construction costs are expensive forest operations. Determining the optimum forest road network density is one of the most important factors in sustainable forest management. Logging me...
متن کاملA Model for Runway Landing Flow and Capacity with Risk and Cost Benefit Factors
As the demand for the civil aviation has been growing for decades and the system becoming increasingly complex, the use of systems engineering and operations research tools have shown to be of further use in managing this system. In this study, we apply such tools in managing landing operations on runways (as the bottleneck and highly valuable resources of air transportation networks) to handle...
متن کاملThe Role of RFID to Improve Materials Flow in Mega-projects Site
In according to quantity of various consumption materials in construction sites of complex projects such as oil industry, infrastructure, and large scale commercial, management and monitoring of materials can affect on the final time and cost of project’s activities. In today’s world of rising labor costs and labor shortages, automated materials tracking can provide some advantage to impr...
متن کامل