Simulation for Steel Bridge Erection by Using Bim Tools
نویسندگان
چکیده
Steel bridge erection requires a series of processes in the construction site including shipping, sequentially lifting, and installing bridge components that are fabricated in the factory. Each process is critical and the risks are high due to the fact that conditions in the field are far more complex than in the factory. A detailed lifting plan is important to ensure the successful completion of steel bridge erection. In this particular study, Building Information Modeling (BIM) tools were used to precisely establish the 3D model of a π shape steel arch bridge following 2D detailed design drawings. Combined with the lifting and installation sequences described in the original lifting plan which were prepared by using 2D drawings and explanations, a 4D simulation for the steel bridge erection was produced and used to review and improve the lifting plan. A spatial conflict of steel component and concrete abutment was detected and corrected in time by postponing pouring of a part of the concrete. Three out of the four issues raised by using the 4D lifting plan were verified and the effectiveness of simulation was confirmed in the construction site.
منابع مشابه
BIM Integrated Workflow Management and Monitoring System for Modular Buildings
The authors are collaborating with a manufacturer of custom built steel frame modular units which are then transported for rapid erection onsite (volumetric building system). As part of its strategy to develop modular housing, Enemetric, is taking the opportunity to develop intelligent buildings, integrating a wide range of sensors and control systems for optimising energy efficiency and direct...
متن کاملBIM-Integrated Construction Operation Simulation for Just-In-Time Production Management
Traditional construction planning, which depends on historical data and heuristic modification, prevents the integration of managerial details such as productivity dynamics. Specifically, the distance between planning and execution brings cost overruns and duration extensions. To minimize variations, this research presents a Building Information Modeling (BIM)-integrated simulation framework fo...
متن کاملUsing Rfid and Real-time Virtual Reality Simulation for Optimization in Steel Construction
This research discusses the implementation of Radio Frequency Identification (RFID) and Virtual Reality (VR) simulations in construction processes and projects. The purposes are to improve the control and monitor of construction projects and to find the optimized solutions for construction processes. The authors have implemented a Building Information Model (BIM) and used it in a VR world. The ...
متن کاملRobotic Kinematics Analogy for Realignment of Defective Construction Assemblies
Aligning and plumbing of construction assemblies is a fundamental problem because of reliance on manual solutions for geometric feedback control problem involved with practices such as pipefitting and steel structures erection. Where defective components and segments are not well controlled, the errors propagate in larger components and therefore cause more severe problems. In order to address ...
متن کاملDevelopment of a Robotic Structural Steel Placement System
The NIST Construction Metrology and Automation Group, in cooperation with the NIST Intelligent Systems Division, is researching robotic structural steel placement as part of a project to develop an Automated Steel Construction Testbed. This project was initiated in response to industry requests for advanced tools and methodologies to speed the erection of steel structures while maintaining or e...
متن کامل