The Swiss Light Source (SLS) at the Paul Scherrer Institute (PSI) consists of a turn key 100 MeV linac, a novel type of booster synchrotron and a 12-TBA storage ring providing 5 nm·rad natural emittance at 2.4 GeV. The SLS project was approved by Swiss Government in Sept. 1997. By June 1999 the building was finished. Linac and booster commissioning concluded by April, resp. Sept. 2000. First beam in the ring was stored Dec. 15, 2000. By June 2001 storage ring commissioning entered the final phase: The design current of 400 mA was reached, an excellent agreement of lattice functions with design calculations was achieved and first undulator spectra were measured. Commissioning of booster and storage ring included commissioning of the innovative subsystems like the digital BPM system [10], the digital power supplies [7], the high stability injection system [5] and the CORBA based beam dynamics software [2].
منابع مشابه
Commissioning of the 100 MeV Swiss Light Source Injector Linac
The 100 MeV injector for the Swiss Light Source, designed and delivered as turnkey system by ACCEL Instruments, was commissioned in April 2000 [1]. A description of the system consisting of electron source, buncher section, accelerating structures, rf power plant and control system will be given. Specified and measured beam parameters will be compared to show the performance of the entire system.
متن کاملSystem Integration of High Level Applications during the Commissioning of the Swiss Light Source
The commissioning of the Swiss Light Source (SLS) started in Feb. 2000 with the Linac, continued in May 2000 with the booster synchrotron and by Dec. 2000 first light in the storage ring were produced. The first four beam lines had to be operational by August 2001. The thorough integration of all subsystems to the control system and a high level of automation was prerequisite to meet the tight ...
متن کاملSystem Integration of High Level Applications during the Commissioning of the Swiss Light Source
The commissioning of the Swiss Light Source (SLS) started in Feb. 2000 with the Linac, continued in May 2000 with the booster synchrotron and by Dec. 2000 first light in the storage ring were produced. The first four beam lines had to be operational by August 2001. The thorough integration of all subsystems to the control system and a high level of automation was prerequisite to meet the tight ...
متن کاملApplication of Digital Regulated Power Supplies for Magnet Control at the Swiss Light Source
The Swiss Light Source (SLS) has in the order of 500 magnet power supplies (PS) installed, ranging from from 3A/20V four-quadrant PS to a 950A/1000V two-quadrant 3 Hz PS. All magnet PS have a local digital controller for a digital regulation loop and a 5 MHz optical point-to-point link to the VME1 level. The PS controller is running a pulse width/pulse repetition regulation scheme, optional wit...
متن کاملApplication of digital regulated Power Supplies for Magnet Control at the Swiss Light Source
The Swiss Light Source (SLS) has in the order of 500 magnet power supplies (PS) installed, ranging from from 3 A/20 V four-quadrant PS to a 950 A/1000 V two-quadrant 3 Hz PS. All magnet PS have a local digital controller for a digital regulation loop and a 5 MHz optical point-to-point link to the VME1 level. The PS controller is running a pulse width/pulse repetition regulation scheme, optional...