Simultaneous Cyclic Scheduling and Control of Tubular Reactors: Parallel Production Lines
نویسندگان
چکیده
In this work we propose a simultaneous scheduling and control optimization formulation to address both optimal steady-state production and dynamic product transitions in multiproduct tubular reactors working in several parallel production lines. Because the problem involves integer and continuous variables and the dynamic behavior of the underlying system the resulting optimization problem is cast as a Mixed-Integer Dynamic Optimization (MIDO) problem. Moreover, because spatial and temporal variations are considered when modeling the addressed systems, the dynamic systems give rise to a system of one-dimensional partial differential equations. For solving the MIDO problems we transform them into a mixed-integer nonlinear programs (MINLP). We use the method of lines for spatial discretization, whereas orthogonal collocation on finite elements was used for temporal discretization. The proposed simultaneous scheduling and control formulation is tested using three multiproduct continuous tubular reactors featuring complex nonlinear behavior.
منابع مشابه
Simultaneous Cyclic Scheduling and Control of Tubular Reactors: Single Production Lines
In this work we propose a simultaneous scheduling and control optimization formulation to address both optimal steady-state production and dynamic product transitions in continuous multiproduct tubular reactors. The simultaneous scheduling and control problem for continuous multiproduct tubular reactors is cast as a Mixed-Integer Dynamic Optimization (MIDO) problem. The dynamic behavior of the ...
متن کاملSimultaneous Scheduling and Control of Multiproduct Continuous Parallel Lines
In this work we propose a simultaneous scheduling and control optimization formulation to address both optimal steady-state production and dynamic product transitions in multiproduct parallel continuous stirred tank reactors. The simultaneous scheduling and control problem for multiproduct parallel continuous reactors is cast as a Mixed-Integer Dynamic Optimization (MIDO) problem. The reactor d...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملSimultaneous Lot Sizing and Scheduling in a Flexible Flow Line
This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...
متن کاملSimultaneous Cyclic Scheduling and Control of a Multiproduct CSTR Reactor
In this work we propose a scheduling and control formulation for simultaneously addressing scheduling and control problems by explicitly incorporating process dynamics in the form of system constraints that ought to be met. The formulation takes into account the interactions between such problems and is able to cope with nonlinearities embedded into the processing system. The simultaneous sched...