The reentrant hybrid flow shop for a heat treatment process is considered in this study. We consider job scheduling in a reentrant hybrid flow shop problem that consists of two statges in series. The first stage is washing, followed by heat treating in the second stage. Each job passes through the first and second stages, respectively, and then re-enter the first stage one more time. Since the first stage must process the jobs twice (with different processing times depending upon the type of the jobs), it becomes the bottleneck in this flow shop problem. To resolve this problem, the jobs needed to be better sequenced to balance the load among the first and the second stages. The objective is to minimize makespan of a set of jobs and increase the utilization of the both stages. This problem was formulated as a mixed integer program (MIP). The results from the data set show that the utilization of the second stage (heat treating) increased from 79.5% to their full capacity at 100%, exceeding the target set by the company at 95%.
منابع مشابه
A multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation
Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...
متن کاملModeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities
Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...
متن کاملAppling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...
متن کاملSolving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملImproved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems
Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...