Applying Scheduling by Edge Reversal to Constraint Partitioning

نویسندگان

  • Marluce Rodrigues Pereira
  • Patrícia Kayser Vargas
  • Felipe Maia Galvão França
  • Maria Clicia Stelling de Castro
  • Inês de Castro Dutra
چکیده

Scheduling by Edge Reversal (SER) is a fully distributed scheduling mechanism based on the manipulation of acyclic orientations of a graph. This work uses SER to perform constraint partitioning of Constraint Satisfaction Problems (CSP). In order to apply the SER mechanism, the graph representing the constraints must receive an acyclic orientation. Since obtaining an optimal acyclic orientation is an NP-hard problem, this work studies three non-deterministic strategies known in the literature: Alg-Neigh, Alg-Edges, and Alg-Colour. We implemented the three algorithms and the SER scheduling mechanism, applying them to the CSP constraint networks generated from 3 applications. Our results show that SER has a great potential to perform a good partitioning of the constraint graphs.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Cockpit Crew Pairing Problem in Airline Scheduling: Shortest Path with Resources Constraints Approach

Increasing competition in the air transport market has intensified active airlines’ efforts to keep their market share by attaching due importance to cost management aimed at reduced final prices. Crew costs are second only to fuel costs on the cost list of airline companies. So, this paper attempts to investigate the cockpit crew pairing problem. The set partitioning problem has been used for ...

متن کامل

AN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK

Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...

متن کامل

Visopt ShopFloor: On the Edge of Planning and Scheduling

Visopt ShopFloor is a complete system for solving real-life scheduling problems in complex industries. In particular, the system is intended to problem areas where traditional scheduling methods failed. In the paper we describe the heart of the Visopt system, a generic scheduling engine. This engine goes beyond traditional scheduling by offering some planning capabilities. We achieved this inte...

متن کامل

Agent-based approach for cooperative scheduling

This paper studies the multi-factory production (MFP) network scheduling problem where a number of different individual factories join together to form a MFP network, in which these factories can operate more economically than operating individually. However, in such network which known as virtual production network with self-interested factories with transportation times, each individual facto...

متن کامل

Distributed Constraints for Large-Scale Scheduling Problems

Many problems of theoretical and practical interest can be formulated as Constraint Satisfaction Problems (CSPs). The general CSP is known to be NP-complete; however, distributed models may reduce the exponential complexity by partitioning the problem into a set of subproblems. In this work, we present a distributed model for solving large-scale CSPs in which agents are committed to sets of con...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003