Complexity and Algorithms for Two-Stage Flexible Flowshop Scheduling with Availability Constraints
نویسندگان
چکیده
This paper considers the two-stage flexible flowshop scheduling problem with availability constraints. We discuss the complexity and the approximability of the problem, and provide some approximation algorithms with finite and tight worst case performance bounds for some special cases of the problem.
منابع مشابه
Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملFlexible Scheduling of Active Distribution Networks for Market Participation with Considering DGs Availability
The availability of sufficient and economic online capacity to support the network while encountering disturbances and failures leading to supply and demand imbalance has a crucial role in today distribution networks with high share of Distributed Energy Resources (DERs), especially Renewable Energy Resources (RESs). This paper proposes a two-stage decision making framework for the Distribution...
متن کاملMinimizing the energy consumption and the total weighted tardiness for the flexible flowshop using NSGA-II and NRGA
This paper presents a bi-objective MIP model for the flexible flow shop scheduling problem (FFSP) in which the total weighted tardiness and the energy consumption are minimized simultaneously. In addition to considering unrelated machines at each stage, the set-up times are supposed to be sequence- and machine-dependent, and it is assumed that jobs have different release tim...
متن کاملAppling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2005