A Priori and A Posteriori Aggregation Procedures to Reduce Model Size in MIP Mine Planning Models
نویسندگان
چکیده
Mine planning models have proved to be very effective in supporting decisions on sequencing the extraction of material in copper mines. These models have been developed for CODELCO, the Chilean state copper mine and used successfully. Here, we wish to develop a corporate model, including all mines of CODELCO. The original models are extremely large MIPs. In order to run a global model, the original models need to be reduced significantly. We develop an approach to aggregate the models. The aggregation is done both on the original data of the mine as well as on the MIP original models. The aggregation is based on clustering analysis. Promising results were obtained with data of a large underground mine.
منابع مشابه
A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملInvestigation of the rock blast fragmentation based on the specific explosive energy and in-situ block size
The assessment of fragmentation through blasting and therefore subsequent crushing and grinding stages is important in order to control and optimize the mining operation. Prediction of the mean size of fragmented rock by the rock mass characteristics, the blasting geometry, the technical parameters and the explosive properties is an important challenge for the blasting engineers. Some of the ef...
متن کاملCommodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method
Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...
متن کاملDESIGNING AN OPERATIONAL PLANNING MODEL FOR HOSPITALS AFFILIATED TO THE MINISTRY OF HEALTH AND MEDICAL EDUCATION OF IRAN
Background & Aims: The operational planning is a process that by it managers regular the actions for receiving to goals. One of The problems in Management of Iranian hospitals is the lack of native model for operational planning. This study has been conducted to designing a model for operational planning in Hospitals affiliated to the Ministry of Health and Medical Education of Iran. Materials ...
متن کاملA Methodology to Estimate Ores Work Index Values, Using Miduk Copper Mine Sample
It is always attempted to reduce the costs of comminution in mineral processing plants. One of thedifficulties in size reduction section is not to be designed properly. The key factor to design size reductionunits such as crushers and grinding mills, is ore’s work index. The work index, wi, presents the oregrindability, and is used in Bond formula to calculate the required energy. Bond has defi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Electronic Notes in Discrete Mathematics
دوره 30 شماره
صفحات -
تاریخ انتشار 2008