Schedule Control of Coal Mine Construction Projects Based on Factor Analysis
نویسندگان
چکیده
Schedule management is the crucial capability for large-scale coal mining investors to successful finish the construction project, which could get by the accumulation of the long-time institutional executive force and ability training. By using factor analysis and validation analysis, extracted control factors of schedule management from data have been made in large coal mine construction companies. Some control factors have a greater influence on the schedule management which are the system factor, measures factor, economic controlling factor, behavioral factor, process factor, organization factor, thus the enterprise schedule management system should include the terms of the above factors.
منابع مشابه
Factor Analysis of Risk Variables Affecting Occupational Injuries: A Field Study in Construction Projects
Background and Objective: Approximately, half of the occupational accidents are associated with the construction industry in Iran. Therefore, the factor analysis of risk variables affecting occupational injuries in the construction industry can lead to understanding and reducing the rate of injuries in these projects. The purpose of this study was to identify the risk factors affecting the type...
متن کاملApplication of an integrated decision-making approach based on FDAHP and PROMETHEE for selection of optimal coal seam for mechanization; A case study of the Tazareh coal mine complex, Iran
Increasing the production rate and minimizing the related costs, while optimizing the safety measures, are nowadays’ most important tasks in the mining industry. To these ends, mechanization of mines could be applied, which can result in significant cost reductions and higher levels of profitability for underground mines. The potential of a coal mine mechanization depends on some important fact...
متن کاملConstructive Dynamisms of Large-Scale Urban Projects by the Space Political Economy Approach; a Case Study of Mashhad Metropolis
Aims: The development of large-scale construction projects has transformed the shape of cities towards specific objectives and based on economic and political perspectives that dominate policy-making and planning in cities. The purpose of the research was to study and analyze the spatiality of Mashhad construction mega-projects and to explain the constructive forces and dynamisms of these proje...
متن کاملEnvironmental impacts of Aghdarband coal mine: pollution by heavy metals
Aghdarband coal mine, located in NE of Iran, with annual coal and waste production capacity of about twenty million and six thousand tons, respectively, causes the increase of the concentration of some heavy metals in the soil and surrounded sediments. This paper deals with geochemical distribution and environmental effects of the heavy metals on the sediments around the mine, using geochemical...
متن کاملDevelopment of a site-specific regression model for assessment of road-header cutting performance of Tabas coal mine based on rock properties
In underground excavation, where the road-headers are employed, a precise prediction of the road-header performance has a vital role in the economy of the project. In this paper, a new model is developed for prediction of the road-header performance using the non-linear multivariate regression analysis. This model is able to estimate the instantaneous cutting rate (ICR) of roadheader based on r...
متن کامل