Critical path analysis in the network with fuzzy activity times

نویسندگان

  • Stefan Chanas
  • Pawel Zielinski
چکیده

A natural generalization of the criticality notion in a network with fuzzy activity times is given. It consists in direct application of the extension principle of Zadeh to the notion of criticality of a path (an activity, an event) treated as a function of the activities duration times in the network. There are shown some relations between the notion of fuzzy criticality, introduced in the paper, and the notion of interval criticality (criticality in the network with interval activity times) proposed by the authors in another paper. Two methods of calculation of the path degree of criticality (according to the proposed concept of fuzzy criticality) are presented. c © 2001 Elsevier Science B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of critical paths in a project network with random fuzzy activity times

Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...

متن کامل

An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks

  We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...

متن کامل

A simple approach to fuzzy critical path analysis in project networks

In this paper, we propose a new approach to critical path analysis in a project network whose activity times are uncertain. The uncertain parameters in the project network are represented by fuzzy numbers. We use fuzzy arithmetic and a fuzzy ranking method to determine the fuzzy critical path of the project network without converting the fuzzy activity times to classical numbers. The proposed m...

متن کامل

Solving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets

Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternativ...

متن کامل

Fuzzy critical path analysis based on centroid of centroids of fuzzy numbers and new subtraction method

This paper proposes a new method to solve fuzzy critical path problems for a project network with activity times being normalised trapezoidal fuzzy numbers. is solved successfully to demonstrate the validity of the proposed approach.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Fuzzy Sets and Systems

دوره 122  شماره 

صفحات  -

تاریخ انتشار 2001