The SPEAR2 accelerator system originally had 3 RF stations (2 for storage ring, 1 Booster) operating at 358.5 MHz. SPEAR3 now operates at 476.3 MHz with the PEPII type RF system, while the Booster RF frequency remains unchanged. For top-off operation, the Booster injects single 3.0 GeV electron bunches into SPEAR3 at 10 Hz every 5 minutes to replenish lost charge. Due to the frequency mismatch between SPEAR3 and the Booster, only one SPEAR3 bucket can injected per shot limiting injection rate and overall system flexibility. The aging high-power RF subsystems of the Booster pose a reliability issue as well. In order to remove these constraints, studies are underway to replace the Booster RF system using the PEP-II type RF system as a baseline. The new Booster RF system will be tuned to 475.036 MHz, and phase-locked to the SPEAR3 RF system. The project calls for ramping the Booster cavity gap voltage to 0.80 MV at 10 Hz, each with a 40 ms acceleration interval. With very low beam loading and low average RF power, there are many subsystems that can be operationally simplified. In this paper we present the results of analysis leading to a new Booster RF system.
منابع مشابه
Spear2 Rf Operation: a Bridge to Spear3*
The present schedule calls for the Spear2 RF system operation until March of 2003, when it will be dismantled to make room for the Spear3. While any new investment to improve the system is discouraged for this limited-time operation, efforts are focused on maintaining the system reliability and accommodating any changes necessitated by new construction in preparation for the Spear3. In this pap...
متن کاملSpear3 Intermediate Dc Magnet Power Supplies
P. Bellomo, A. de Lira (SLAC) Menlo Park, CA 94025-7015, USA Abstract The Stanford Synchrotron Radiation Laboratory (SSRL) has successfully commissioned SPEAR3, its newly upgraded 3-GeV synchrotron light source. First stored beam occurred December 15, 2003 and 100mA operation was reached on January 20, 2004. This paper describes the specification, design, and performance of the SPEAR3 DC magnet...
متن کاملPhotocathode Studies for the Spear3 Injector Rf Gun*
The electron gun for the SPEAR3 injector operates with a warm thermionic dispenser cathode immersed in a 1.5-cell RF structure. At each injection cycle the gun accelerates several thousand electron bunches up to ~3 MeV during a 2.5us rf pulse. The individual bunches are then compressed by an alpha magnet and a travellingwave chopper selects 3-5 bunches so they don’t cause beam loading to the li...
متن کاملThe Spear Injector Rf Gun and Linac Performace*
In light of the SPEAR3 upgrade project where the goal is to store up to 500 mA of beam current at 3.0 GeV beam energy, the injector RF gun and linac performance must be optimised in terms of reliability and injection rate. The basic linac system layout has not been changed for the last ten years of operation. A thermionic1.5-cell standing wave RF gun is the source of bunched beams at 10 Hz. An ...
متن کاملOverview of the Spear3 Vacuum System*
The conceptual design of the vacuum system for the upgrade project of SPEAR3 is reviewed. The majority of the vacuum system components, except for insertion devices, will be replaced with components capable of 500 mA operation at 3 GeV. General requirements and overall layout of the vacuum system are discussed. Diagnostic chambers and speciality components are briefly discussed.