A Short-term Production Planning Model for Dimension Stone Quarries

نویسنده

  • E. Bakhtavar
چکیده

In this paper, problem of short-term production planning for dimension stone quarries was mathematically modeled using a binary integer programming. The model includes an objective function, which was founded as the minimization of the costs due to the total cutting planes of the blocks. This objective may cause to maximization of the net present value (NPV) in dimension stone quarries. During the mathematical modeling the essential constraints are dimension stone quarry capacities and the market demand, block accessibility for the equipment and the reserve constraints. As a base, an optimal size and shape of extractable blocks should be first assigned according to the available extraction technique and the market demand, in order to create a geological block model. Then an economical block model is provided by assignment of a value of “one” for ore blocks and “zero” for waste. Maximum profitability and minimum amount of the ore wastage can be gained using this plan and modeling. INTRODUCTION Providing the amount of dimension stones that is needed for the processing factories (market) can be optimally achieved by means of a short-term production planning. Numerous studies to the problem of short and long term production planning and scheduling in “open pit mining” have been appeared by using the operation research methods in the literatures. But, for such planning in “dimension stone quarrying” industry, there is no considerable study. The production operation and concepts of dimension stone quarrying are partly different than other metal and non-metal open-pit mining. Unlike to the open-pit mining operation which produces ore in form of fragmented materials by bench blasting, in the dimension stone quarrying only the blocks with marketable size and shapes are desired. These blocks can be appropriately provided using the mechanized techniques such as diamond wire cutting and armed-chained cutting machines. A production planning should be shortly set for the blocks extraction with the objective of maximizing net present value (NPV) or profit considering the maximum efficiency, minimum wastage, maximum recovery of the reserves. A certain stone quality was found as the best decision variable for planning dimension stones [1]. A method was also presented for determination of amount of the marketable blocks before extraction operation.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Utilization of Soft Computing for Evaluating the Performance of Stone Sawing Machines, Iranian Quarries

The escalating construction industry has led to a drastic increase in the dimension stone demand in the construction, mining and industry sectors. Assessment and investigation of mining projects and stone processing plants such as sawing machines is necessary to manage and respond to the sawing performance; hence, the soft computing techniques were considered as a challenging task due to stocha...

متن کامل

Ranking sawability of dimension stone using PROMETHEE method

Predicting the sawability of the dimension stone is one of the most important factors involved in production planning. Moreover, this factor can be used as an important criterion in the cost estimation and planning of the stone plants. The main purpose for carrying out this work was to rank the sawability of the dimension stone using the PROMETHEE method. In this research work, four important p...

متن کامل

Application of harmony search algorithm to evaluate performance of diamond wire saw

Evaluation and prediction of performance of diamond wire saw is one of the most important factors involved in planning the dimension stone quarries. The wear rate of diamond wire saw can be investigated as a major criterion to evaluate its performance. The wear rate of diamond wire saw depends upon non-controlled parameters related to rock characteristics and controlled parameters related to ch...

متن کامل

Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty

Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...

متن کامل

A mathematical model for the design of distributed layout by considering production planning and system reconfiguration over multiple time periods

In this paper, we develop a new mathematical model that integrates layout configuration and production planning in the design of dynamic distributed layouts. The model incorporates a number of important manufacturing attributes such as demand fluctuation, system reconfiguration, lot splitting, work load balancing, alternative routings, machine capability and tooling requirements. In addition, t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011