The multiple-agent scheduling problems have received increasing attention recently. However, most of the research focuses on studying the computational complexity of the intractable cases or examining problems with a single criterion. Often a decision maker has to decide the schedule based on multiple criteria. In this paper, we consider a single machine problem where the objective is to minimize a linear combination of the total completion time and the maximum tardiness of jobs from the first agent given that no tardy jobs are allowed for the second agent. We develop a branch-and-bound algorithm and several simulated annealing algorithms to search for the optimal solution and near-optimal solutions for the problem, respectively. Computational experiments show that the proposed branch-and-bound algorithm could solve problems of up to 24 jobs in a reasonable amount of time and the performance of the combined simulated annealing algorithm is very good with an average error percentage of less than 0.5% for all the tested cases. 2013 Elsevier Inc. All rights reserved.
منابع مشابه
JIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملFlow shop Scheduling Problem with Maintenance Coordination: a New Approach
This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...
متن کاملGENETIC AND TABU SEARCH ALGORITHMS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DETERIORATING JOBS
This paper introduces the effects of job deterioration and sequence dependent set- up time in a single machine scheduling problem. The considered optimization criterion is the minimization of the makespan (Cmax). For this purpose, after formulating the mathematical model, genetic and tabu search algorithms were developed for the problem. Since population diversity is a very important issue in ...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملAn Efficient Bi-objective Genetic Algorithm for the Single Batch-Processing Machine Scheduling Problem with Sequence Dependent Family Setup Time and Non-identical Job Sizes
This paper considers the problem of minimizing make-span and maximum tardiness simultaneously for scheduling jobs under non-identical job sizes, dynamic job arrivals, incompatible job families,and sequence-dependentfamily setup time on the single batch- processor, where split size of jobs is allowed between batches. At first, a new Mixed Integer Linear Programming (MILP) model is proposed for t...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Applied Mathematics and Computation
دوره 219 شماره
صفحات -
تاریخ انتشار 2013