A maximum flow formulation of a multi-period open-pit mining problem
نویسندگان
چکیده
We consider the problem of finding an optimal mining sequence for an open pit during a number of time periods subject to only spatial and temporal precedence constraints. This problem is of interest because such constraints are generic to any open-pit scheduling problem and, in particular, because it arises as a Lagrangean relaxation of an open-pit scheduling problem. We show that this multi-period open-pit mining problem can be solved as a maximum flow problem in a time-expanded mine graph. Further, the minimum cut in this graph will define an optimal sequence of pits. This result extends a well-known result of J.-C. Picard from 1976 for the open-pit mine design problem, that is, the single-period case, to the case of multiple time periods.
منابع مشابه
Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
متن کاملAn Approach to Locate an in Pit Crusher in Open Pit Mines
Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....
متن کاملThe effect of price changes on optimum cut-off grade of different open-pit mines
Maximizing economic earnings is the most common goal in cut-off grade optimization of open-pit mining operations. When this is the case, the price of the product has a critical effect on optimum value of cut-off grade. This paper investigates the relationship between optimum cut-off grade and price to maximize total cash flow and net percent value (NPV) of operation. In order to visualize this ...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملA Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Operational Research
دوره 14 شماره
صفحات -
تاریخ انتشار 2014