A structured process to managing complex interactions between project risks
نویسنده
چکیده
This paper presents a structured Project Risk Interactions Management (PRIM) process designed to make risk response planning decisions taking into account the complex interactions that potentially exist between project risks. Projects are facing tight constraints, uncertainty and change. Moreover, they are dealing with higher stakes and an ever-growing complexity, which implies that they are more than ever exposed to risks, and that these risks are strongly interrelated. Existing classical methods have some limitations for modeling and managing the project complexity, mainly the interactions that may exist between project risks. We propose to include the identification, assessment and analysis of these interactions into the classical Project Risk Management (PRM) process.This analysis gives new insights for risk response planning decisions. The strategies are always mitigation, acceptance, transfer or avoidance, but the risks which are defined as the most critical ones may be slightly different. There may also be innovative decisions, like breaking propagation transitions between interrelated risks, instead of acting on the risk itself. This process assists the project manager making decisions regarding risk response planning by providing new insights about the potential phenomena involved by complexity, about the internal weaknesses to cope with this complexity, and about the potential effectiveness of proposed mitigation actions. An example of application is detailed to illustrate the validity and the implementation issue of the process.
منابع مشابه
A New Approach to Project Risk Responses Selection with Inter-dependent Risks
Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and dependent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. Th...
متن کاملProject Portfolio Risk Response Selection Using Bayesian Belief Networks
Risk identification, impact assessment, and response planning constitute three building blocks of project risk management. Correspondingly, three types of interactions could be envisioned between risks, between impacts of several risks on a portfolio component, and between several responses. While the interdependency of risks is a well-recognized issue, the other two types of interactions remai...
متن کاملDeveloping an Integrated Simulation Model of Bayesian-networks to Estimate the Completion Cost of a Project under Risk: Case Study on Phase 13 of South Pars Gas Field Development Projects
Objective: The aim of this paper is to propose a new approach to assess the aggregated impact of risks on the completion cost of a construction project. Such an aggregated impact includes the main impacts of risks as well as the impacts of interactions caused by dependencies among them. Methods: In this study, Monte Carlo simulation and Bayesian Networks methods are combined to present a frame...
متن کاملKNOWLEDGE MANAGEMENT TO INVESTIGATE THE FAILURE FACTORS IN MANAGING OF GAS AND OIL INDUSTRY TRANSMISSION LINES PROJECTS
In this study the challenges of managing the civil projects in oil and gas industry over recent years that failed were investigated. For this purpose, the relevant cases and their effectiveness were categorized by analyzing research data obtained from the questionnaire results. The results obtained from the research showed that there is a positive and significant relationship between the projec...
متن کاملA MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS
Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...
متن کامل