Using aggregation to optimize long-term production planning at an underground mine

نویسندگان

  • Alexandra M. Newman
  • Mark Kuchta
چکیده

Motivated by an underground mining operation at Kiruna, Sweden, we formulate a mixed integer program to schedule iron ore production over multiple time periods. Our optimization model determines an operationally feasible ore extraction sequence that minimizes deviations from planned production quantities. The number of binary decision variables in our model is large enough that directly solving the full, detailed problem for a three year time horizon requires hours, or even days. We therefore design a heuristic based on solving a smaller, more tractable, model in which we aggregate time periods, and then solving the original model using information gained from the aggregated model. We compute a bound on the worst case performance of this heuristic and demonstrate empirically that this procedure produces good quality solutions while substantially reducing computation time for problem instances from the Kiruna mine. 2005 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty

Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...

متن کامل

Integrated optimization of underground mine design and scheduling

It is well recognized that software tools for strategic underground mine planning are lacking, and that the demand for these tools will increase as deeper deposits amenable to underground mining continue to grow in value. While a number of optimization techniques have been developed for stope layout design and progress continues to be made in the area of production scheduling, both of these min...

متن کامل

Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines

We present a methodology for long-term mine planning based on a general capacitated multicommodity network flow formulation. It considers underground and open-pit ore deposits sharing multiple downstream processing plants over a long horizon. The purpose of the model is to optimize several mines in an integrated fashion, but real size instances are hard to solve due to the combinatorial nature ...

متن کامل

Extensions to an Efficient Optimization Model for Long-term Production Planning

LKAB’s Kiruna Mine is located above the Arctic Circle in northern Sweden, and produces about 24 million tons of iron ore per year, making it is the second largest underground mine in the world today. The orebody, a world-class high-grade magnetite deposit, is approximately 4 km long and 80 m wide on average, and lies roughly in the north-south direction, with a dip of some 60 degrees. Surface m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 176  شماره 

صفحات  -

تاریخ انتشار 2007