Hybrid constructive heuristics for the critical node problem

نویسندگان

  • Bernardetta Addis
  • Roberto Aringhieri
  • Andrea Grosso
  • Pierre Hosteins
چکیده

We consider the Critical Node Problem: given an undirected graph and an integer number K, at most K nodes have to be deleted from the graph in order to minimize a connectivity measure in the residual graph. We combine the basic steps used in common greedy algorithms with some flavour of local search, in order to obtain simple “hybrid” heuristic algorithm. The obtained algorithms are shown to be effective, delivering improved performances (solution quality and speed) with respect to known greedy algorithms and other more sophisticated state of the art methods.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Hybrid Meta-Heuristics Approach to Solve the Parallel Machine Scheduling Problem Considering Human Resiliency Engineering

This paper proposes a mixed integer programming model to solve a non-identical parallel machine (NIPM) scheduling with sequence-dependent set-up times and human resiliency engineering. The presented mathematical model is formulated to consider human factors including Learning, Teamwork and Awareness. Moreover, processing time of jobs are assumed to be non-deterministic and dependent to their st...

متن کامل

Addressing a fixed charge transportation problem with multi-route and different capacities by novel hybrid meta-heuristics

In most real world application and problems, a homogeneous product is carried from an origin to a destination by using different transportation modes (e.g., road, air, rail and water). This paper investigates a fixed charge transportation problem (FCTP), in which there are different routes with different capacities between suppliers and customers. To solve such a NP-hard problem, four meta-heur...

متن کامل

A Hybrid Solution Approach Based on Benders Decomposition and Meta-Heuristics to Solve Supply Chain Network Design Problem

Supply Chain Network Design (SCND) is a strategic supply chain management problem that determines its configuration. This mainly focuses on the facilities location, capacity sizing, technology selection, supplier selection, transportation, allocation of production and distribution facilities to the market, and so on. Although the optimal solution of the SCND problem leads to a significant reduc...

متن کامل

An Efficient Hybrid Metaheuristic for Capacitated p-Median Problem

Capacitated p-median problem (CPMP) is a well-known facility-location problem, in which p capacitated facility points are selected to satisfy n demand points in such a way that the total assigned demand to each facility does not exceed its capacity. Minimizing the total sum of distances between each demand point and its nearest facility point is the objective of the problem. Developing an effic...

متن کامل

New Approaches in Meta-heuristics to Schedule Purposeful Inspections of Workshops in Manufacturing Supply Chains

Nowadays, with the growth of technology and the industrialization of societies, work-related accidents, and consequently the threat of human capital and material resources are among the problems of the countries of the world. The most important legal solution in most countries to control occupational accidents and illnesses is to conduct periodic site visits and identify hazardous sites. To the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Annals OR

دوره 238  شماره 

صفحات  -

تاریخ انتشار 2016