Test Generation and Scheduling for a Hybrid BIST Considering Test Time and Power Constraint
نویسندگان
چکیده
This paper presents a novel approach for test generation and test scheduling for multi-clock domain SoCs. A concurrent hybrid BIST architecture is proposed for testing cores. Furthermore, a heuristic for selecting cores to be tested concurrently and order of applying test patterns is proposed. Experimental results show that the proposed heuristics give us an optimized method for multi clock domain SoC testing in comparison with the previous works. Keywords-SoC hybrid BIST; power constraint testing;test scheduling; test generation; DFT
منابع مشابه
Scheduling security constraint unit commitment for power system including stochastic wind power generation
This paper introduces a new approach for scheduling security constraint unit commitment (SCUC) including wind farms. Because of uncertainty in wind power production, we tried to develop a new method for incorporating wind power generation in power plant scheduling. For this, wind power generation modeled with unit commitment in a non-linear optimization problem and simulated by submitting diffe...
متن کاملThree Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملA new system for BIST architecture generation for embedded memories in SoCs
The paper is aimed at a new system for generation of suitable BIST (Built-in Self-Test) blocks for effective testing of multiple memories integrated in a SoC (System on Chip). Incoming technologies, chip complexity and increasing clock frequencies give new challenges for testing huge number of embedded SoC memories. SoCs have to be tested after their manufacturing and always during their life-t...
متن کاملOptimal Scheduling of Battery Energy Storage System in Distribution Network Considering Uncertainties using hybrid Monte Carlo- Genetic Approach
This paper proposes a novel hybrid Monte Carlo simulation-genetic approach (MCS-GA) for optimal operation of a distribution network considering renewable energy generation systems (REGSs) and battery energy storage systems (BESSs). The aim of this paper is to design an optimal charging /discharging scheduling of BESSs so that the total daily profit of distribution company (Disco) can be maximiz...
متن کاملHybrid Built-In Self-Test and Test Generation Techniques for Digital Systems
The technological development is enabling the production of increasingly complex electronic systems. All such systems must be verified and tested to guarantee their correct behavior. As the complexity grows, testing has become one of the most significant factors that contribute to the total development cost. In recent years, we have also witnessed the inadequacy of the established testing metho...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1711.08974 شماره
صفحات -
تاریخ انتشار 2017