A cutting and scheduling problem in float glass manufacturing
نویسندگان
چکیده
This paper considers a cutting and scheduling problem of minimizing scrap motivated by float glass manufacturing and introduces the FGSP (float glass scheduling problem). We relate it to classical problems in the scheduling literature such as no-wait hybrid flow shops and cyclic scheduling. We show that the problem is NP-hard, and identify when each of the problem’s components are polynomially solvable and when they induce hardness. In addition, we propose a simple heuristic algorithm, provide its worst-case performance bounds, and demonstrate that the bounds are tight. When the number of machines is two, the worst-case performance is 53 .
منابع مشابه
Optimization of automated float glass lines
In automated float glass manufacturing, a continuous ribbon of glass is cut according to customer orders and then offloaded using robots. We consider the problem of laying out and sequencing the orders on the ribbon so as to minimize waste. The problem combines characteristics of cutting, packing, and sequencing problems. Given the size and the complexity of the problem, we propose a two-phase ...
متن کاملA HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL
This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genet...
متن کاملA novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study
Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...
متن کاملScheduling Problem of Virtual Cellular Manufacturing Systems (VCMS); Using Simulated Annealing and Genetic Algorithm based Heuristics
In this paper, we present a simulated annealing (SA) and a genetic algorithm (GA) based on heuristics for scheduling problem of jobs in virtual cellular manufacturing systems. A virtual manufacturing cell (VMC) is a group of resources that is dedicated to the manufacturing of a part family. Although this grouping is not reflected in the physical structure of the manufacturing system, but machin...
متن کاملScheduling Problem of Virtual Cellular Manufacturing Systems (VCMS); Using Simulated Annealing and Genetic Algorithm based Heuristics
In this paper, we present a simulated annealing (SA) and a genetic algorithm (GA) based on heuristics for scheduling problem of jobs in virtual cellular manufacturing systems. A virtual manufacturing cell (VMC) is a group of resources that is dedicated to the manufacturing of a part family. Although this grouping is not reflected in the physical structure of the manufacturing system, but machin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Scheduling
دوره 17 شماره
صفحات -
تاریخ انتشار 2014