The Feasible Transition Graph: Encoding Topology and Manipulation Constraints for Multirobot Push-Planning
نویسندگان
چکیده
Planning for multirobot manipulation in dense clutter becomes particularly challenging as the motion of the manipulated object causes the connectivity of the robots’ free space to change. This paper introduces a data structure, the Feasible Transition Graph (FTG), and algorithms that solve such complex motion planning problems. We define an equivalence relation over object configurations based on the robots’ free space connectivity. Within an equivalence class, the homogeneous multirobot motion planning problem is straightforward, which allows us to decouple the problems of composing feasible object motions and planning paths for individual robots. The FTG captures transitions among the equivalence classes and encodes constraints that must be satisfied for the robots to manipulate the object. From this data structure, we readily derive a complete planner to coordinate such motion. Finally, we show how to construct the FTG in some sample environments and discuss future adaptations to general environments.
منابع مشابه
Optimal Coordination of Distance and Directional Overcurrent Relays Considering Different Network Topologies
Most studies in relay coordination have focused solely on coordination of overcurrent relays while distance relays are used as the main protection of transmission lines. Since, simultaneous coordination of these two types of relays can provide a better protection, in this paper, a new approach is proposed for simultaneous coordination of distance and directional overcurrent relays (D&DOCRs). Al...
متن کاملA Pomset-Based Model for Estimating Workcells' Setups in Assembly Sequence Planning
This paper presents a model based on pomsets (partially ordered multisets) for estimating the minimum number of setups in the workcells in Assembly Sequence Planning. This problem is focused through the minimization of the makespan (total assembly time) in a multirobot system. The planning model considers, apart from the durations and resources needed for the assembly tasks, the delays due to t...
متن کاملA Model for Assembly Sequence Planning in a Multirobot Environment
This paper presents a model for the selection of optimal assembly sequences for a product in multirobot systems. The objective of the plan is the minimization of the total assembly time (makespan). To meet this objective, the model takes into account, in addition to the assembly times and resources for each task, the times needed to change tools in the robots, and the delays due to the transpor...
متن کاملTHIN WALLED STEEL SECTIONS’ FREE SHAPE OPTIMIZATION USING CHARGED SYSTEM SEARCH ALGORITHM
Graph theory based methods are powerful means for representing structural systems so that their geometry and topology can be understood clearly. The combination of graph theory based methods and some metaheuristics can offer effective solutions for complex engineering optimization problems. This paper presents a Charged System Search (CSS) algorithm for the free shape optimizations of thin-wall...
متن کاملSimilar Part Rearrangement With Pebble Graphs
This work proposes a method for effectively computing manipulation paths to rearrange similar objects in a cluttered space. The solution can be used to place similar products in a factory floor in a desirable arrangement or for retrieving a particular object from a shelf blocked by similarly sized objects. These are challenging problems as they involve combinatorially large, continuous configur...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2014