Scheduling Large and Complex IT Projects Using Sliding-Frame Approach

نویسندگان

  • Yuval Cohen
  • Arik Sadeh
چکیده

Many IT projects and software development projects are very complex and sophisticated involving a large coordinated team. Such projects are a constant part of the operations of software companies such as Microsoft, SAP, Oracle, Google, Yahoo, IBM, and others. Many other companies carry large software projects as part of their IT operations. As a result of the size and complexity of such projects, a rolling horizon approach for their planning and management is not only plausible but also desirable. For large projects, traditional project scheduling techniques cannot provide an optimal and timely solution to minimum project duration under precedence and resource constraints. This paper proposes a technique that allows utilizing non-polynomial (NP) algorithms in a heuristic manner – generating high quality schedules in reasonable time. This approach can be applied efficiently for solving most project scheduling problems. The main advantage of this approach is its ability to dissect the original problem into small sub-problems of a controllable size to which exact techniques can be applied. Thus, it neutralizes the complexity of the applied algorithms (and their non-polynomial growth). Moreover, the same technique could be used for implementing a rolling-horizon approach in project planning and management.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Using a Sliding-Frame Approach for Scheduling Large and Complex IT Projects

Many IT projects and software development projects are very complex and sophisticated involving a large coordinated team. Such projects are a constant part of the operations of software companies such as Microsoft, SAP, Oracle, Google, Yahoo, IBM, and others. Many other companies carry large software projects as part of their IT operations. As a result of the size and complexity of such project...

متن کامل

A MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES

In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

Performance Appraisal of Research and Development Projects Value-Chain for Complex Products and Systems: The Fuzzy Three-Stage DEA Approach

The purpose of the current research is to provide a performance appraisal system capable of considering the value chain network structure of research and development (R&D) projects for Complex products and systems (CoPS) under uncertainty of data. Therefore, in order to achieve this goal, a network data envelopment analysis (NDEA) approach and the possibilistic programming to provide a new fuzz...

متن کامل

Robust Backstepping Control of Induction Motor Drives Using Artificial Neural Networks and Sliding Mode Flux Observers

In this paper, using the three-phase induction motor fifth order model in a stationary twoaxis reference frame with stator current and rotor flux as state variables, a conventional backsteppingcontroller is first designed for speed and rotor flux control of an induction motor drive. Then in orderto make the control system stable and robust against all electromechanical parameter uncertainties a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016